My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Discuss any health and safety related issues. <br />• Review scheduled work activities. <br />• Discuss project related problems. <br />• Review laboratory and field test data. <br />• Discuss the Contractor's personnel and equipment assignments. <br />Review the previous week's activities/accomplishments and review/discuss <br />work planned for the following week. <br />4.3 SPECIAL MEETINGS <br />Special meetings may be conducted as required to discuss problems or <br />deficiencies. At a minimum, these meetings should be attended by the <br />Construction Manager, appropriate Geotechnical. CQA staff and the Contractor. <br />If correction of a problem requires a design modification, the Landfill Engineer <br />and the Geotechnical Project Director will also be present. The purpose of these <br />meetings is to: <br />Define and discuss any problems or deficiencies in the Project. <br />Review possible corrective actions or solutions. <br />Implement an action plan to resolve the problems or deficiencies. <br />Special meetings shall be documented by the Construction Manager or his/her <br />representative and minutes shall be distributed to all parties. <br />5.0 GEOTECHNICAL CQA MONITORING FOR EARTH MATERIALS <br />5.1 GENERAL <br />Construction of the final cover system shall be performed in accordance with the <br />Project Drawings -and Specifications and shall be monitored, observed,.and <br />routinely sampled and tested by the Geotechnical CQA Monitors for the physical <br />parameters described in this section. <br />The testing frequency presented herein is a minimum. Additional tests�will'be <br />conducted by the Geotechnical CQA Monitor at any time that in the opinion of <br />the Geotechnical CQA Monitor, additional testing is required and/or a deficiency <br />is suspected. Retests of previously failed areas will be performed at the discretion <br />of the Geotechnical CQA Monitor when, in his/her opinion, sufficient reworking <br />of the area has been performed to warrant a retest. <br />5.2 COMPACTED FILL PLACEMENT <br />Material for compacted fills shall be obtained from approved borrow areas and <br />conditioned as necessary to meet the requirements of the Project Specification. <br />All fills shall be moisture conditioned as necessary and to the requirements of the <br />-10- <br />C\2001-048TINAL COVER CQA.DOCA08/20/01 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.