My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />7. 1.1 DAILY FIELD INSPECTION REPORT <br />The Geotechnical CQA Monitor(s) shall keep a daily field inspection report of <br />project activities. At a minimum, this report shall include the following: <br />• Date and project identification. <br />Field activity and work locations. <br />• Summaries of field communications. <br />• Summary of equipment used and personnel performing work (i.e. <br />superintendent, welders, etc.). <br />• Work activity monitored its general location on-site, and any related°test <br />results. <br />• Record of material sampling and testing activities. <br />• Any variance from specified methods and standards. <br />• Estimated quantities of material placed and compacted. <br />• Unusual events. <br />• Actions regarding acceptance/rejection of work. <br />Weather conditions. <br />• Signature of person preparing the report. <br />7.1:2 "DAILY TEST'St7M1VIARY REPORT <br />A daily summary report of the field and laboratory tests conducted for-the-CQA of <br />the earth materials portion of the cover will be prepared under the direction of the <br />'Geotechnical CQA Officer. The daily test summary report ill include- <br />-Lor ati-ons <br />nclude: <br />"-Locatinns and °results of all field and laboratory tests withpass/fail-comment. <br />Results of all retests for failed areas with remarks showing the corrective <br />actiontaken-before the retests. If retest(s) also show a rejection, final <br />corrective action shall be noted. <br />Both the daily field inspection report and the daily test summary report shall be <br />reviewed by the Geotechnical CQA Officer and shall be submitted:to the <br />Construction Manager. One complete set of both the daily reports and test <br />summary report shall be kept on-site by CQA personnel at all times. <br />7.2 MONTHLY PROGRESS REPORTS <br />A Monthly Progress Report shall be prepared by the Geotechnical CQA Officer <br />and submitted to the Construction Manager. This monthly progress report shall <br />summarize the work activities, deficiencies, and corrective action implemented. <br />CA2001-048\FINAL COVER_CQA.DOC\08/20/01 <br />-32- <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.