Laserfiche WebLink
• <br />7. 1.1 DAILY FIELD INSPECTION REPORT <br />The Geotechnical CQA Monitor(s) shall keep a daily field inspection report of <br />project activities. At a minimum, this report shall include the following: <br />• Date and project identification. <br />Field activity and work locations. <br />• Summaries of field communications. <br />• Summary of equipment used and personnel performing work (i.e. <br />superintendent, welders, etc.). <br />• Work activity monitored its general location on-site, and any related°test <br />results. <br />• Record of material sampling and testing activities. <br />• Any variance from specified methods and standards. <br />• Estimated quantities of material placed and compacted. <br />• Unusual events. <br />• Actions regarding acceptance/rejection of work. <br />Weather conditions. <br />• Signature of person preparing the report. <br />7.1:2 "DAILY TEST'St7M1VIARY REPORT <br />A daily summary report of the field and laboratory tests conducted for-the-CQA of <br />the earth materials portion of the cover will be prepared under the direction of the <br />'Geotechnical CQA Officer. The daily test summary report ill include- <br />-Lor ati-ons <br />nclude: <br />"-Locatinns and °results of all field and laboratory tests withpass/fail-comment. <br />Results of all retests for failed areas with remarks showing the corrective <br />actiontaken-before the retests. If retest(s) also show a rejection, final <br />corrective action shall be noted. <br />Both the daily field inspection report and the daily test summary report shall be <br />reviewed by the Geotechnical CQA Officer and shall be submitted:to the <br />Construction Manager. One complete set of both the daily reports and test <br />summary report shall be kept on-site by CQA personnel at all times. <br />7.2 MONTHLY PROGRESS REPORTS <br />A Monthly Progress Report shall be prepared by the Geotechnical CQA Officer <br />and submitted to the Construction Manager. This monthly progress report shall <br />summarize the work activities, deficiencies, and corrective action implemented. <br />CA2001-048\FINAL COVER_CQA.DOC\08/20/01 <br />-32- <br />Geologic Associates <br />