My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Unit Requirements for N-339-17-7 (continued) Page 3 of 6 <br />31. The permittee shall notify the APCO by telephone at least 24 hours before performing any maintenance work that <br />requires the system to be shutdown. The notification shall include a description of work, the date work will be <br />performed and the amount of time needed to complete the maintenance work. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />32. Permittee shall maintain records of system inspections including: date, time and inspection results. [District Rule 1070] <br />Federally Enforceable Through Title V Permit <br />33. Permittee shall maintain records of maintenance related or other collection system and control device downtime, <br />including 'individual well shutdown. [District Rule 1070] Federally Enforceable Through Title V Permit <br />34. The operator shall record emission control device source tests (emissions of CO, NOx, and VOC) in pounds per <br />MMbtu heat input. Operator shall also record VOC destruction/treatment efficiency. [District Rule 1081 ] Federally <br />Enforceable Through Title V Permit <br />35. Permittee shall maintain daily records of landfill gas flow rate to the flare. [District Rule 1070] Federally Enforceable <br />Through Title V Permit <br />36. Permittee shall maintain annual records of landfill gas flow rate to the flare. [District NSR Rule] Federally Enforceable <br />Through Title V Permit <br />37. All records shall be retained for a period of at least 5 years and shall be made available for District inspection upon <br />request. [District Rule 1070] Federally Enforceable Through Title V Permit <br />38. The NMOC emission rate shall be calculated using the equation in 40CFR60.754(a)(1)(i), if the actual year-to-year <br />solid waste acceptance rate is known or the equation in 40CFR60.754(a)(1)(ii), if the actual year-to-year solid waste <br />acceptance rate is unknown. The values for k, Lo, and CNMOC for both equations shall be taken from <br />40CFR60.754(a)(1), as appropriate. Both equations may be used if the actual year-to-year acceptance rate is known <br />for a part of the landfill life, but unknown for another part of the landfill life. The mass of nondegradable solid waste <br />may be subtracted from the average annual acceptance rate when calculating R, if documentation of the nature and <br />amount of such wastes is maintained. (Tier 1 specifications) [40 CFR 60.754(a)(1)] Federally Enforceable Through <br />Title V Permit <br />39. If the calculated NMOC emission rate is equal to or greater than 50 megagrams/year, then the landfill owner or <br />operator shall either comply with the requirements of this permit to submit a collection and control design plan and <br />install the system, or determine a site-specific NMOC concentration and recalculate the NMOL emission rate using <br />Tier 2 specifications. [40 CFR 60.754(a)(2)(ii)] Federally Enforceable Through Title V Permit <br />40. Tier 2 specifications to determine the site-specific NMOL concentration shall include the following: 1) For sampling, <br />at least 2 sample probes shall be installed per hectare of landfill surface that has retained waste for at least 2 years, up <br />to a maximum of 50 required probes. One sample of landfill gas shall be collected from each probe to determine the <br />NMOC concentration, using EPA Method 25, 25C, another method approved by the EPA, or 18, in accordance with 40 <br />CFR 60.754(a)(3). If EPA Method 18 is used, the minimum list of compounds to be tested shall be those published in <br />the most recent Compilation of AP42. If composite sampling is used, equal sample volumes are required. All <br />samples taken shall be used in the analysis. The NMOC concentration from Method 25 or 25C shall be divided by 6 to <br />convert from C-NMOC, as carbon to as hexane. 2) For landfills equipped with active collection systems, samples may <br />be collected from the common header pipe before gas moving or condensate removal equipment; a minimum of 3 <br />samples must be collected. [40 CFR 60.754(a)(3), (a)(5)] Federally Enforceable Through Title V Permit <br />41. Tier 2 specifications to determine the site-specific NMOL concentration shall include the following: 1)The NMOC <br />mass emission rate shall be recalculated using the average site-specific concentration, instead of the default value, 2) If <br />the resulting calculated mass emission rate is equal to or greater than 50 megagrams/year, the landfill owner or <br />operator shall either comply with 60.752(b)(2), or determine a site-specific methane generation rate constant and <br />recalculate the NMOC emission rate using Tier 3 specifications, [40 CFR 60.754(a)(3)(i)&(ii)] Federally Enforceable <br />Through Title V Permit <br />is <br />PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br />These terms and conditions are part of the Facility -wide Permit to Operate. <br />Facility Name: FORWARD, INC. LANDFILL <br />Location: 9999 S. AUSTIN ROAD,MANTECA, CA 95336 <br />W330-17.7: J-142000 4:42PM-SIONOCOJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.