WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2003-0049 -11- <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 52. The leachate collection and removal system(LCRS)will consist of a 12-inch gravel layer <br /> with six-inch PVC lateral pipe and headers. The drainage layer will be installed at a <br /> minimum 2%grade with collection pipes placed on approximately 200-foot centers. <br /> Calculated peak daily leachate generation was 4,073 gallons/acre or approximately 0.0045 <br /> cubic feet per second. Daily peak head on the liner system was calculated to be <br /> approximately 1.6 inches. <br /> 53. A pan lysimeters will be installed beneath the landfill leachate sumps for the purpose of <br /> vadose zone monitoring. The proposed design for the pan lysimeters consists of, in <br /> ascending order: a prepared subgrade; a 24-inch thick, low-permeability soil layer(minimum <br /> permeability of 1 X 10"7 cm/sec) or a GCL liner; a 60-mil high density polyethylene (HDPE) <br /> geomembrane; a gravel filled pan lysimeter with access pipe; a GCL liner; a 60-mil high <br /> density polyethylene(HDPE) geomembrane; a gravel filled LCRS sump with access pipe; an <br /> 8-ounce/square yard separator geotextile; and a 12-inch thick protective cover soil operations <br /> layer. <br /> 54. Forward landfill has a vadose-zone monitoring network of twelve suction lysimeters and two <br /> pan lysimeters; the Austin Road landfill is an unlined facility and has no active vadose-zone <br /> monitoring. <br /> 55. The Discharger proposes the following construction quality assurance protocols for liner <br /> construction: <br /> a. monitor placement of drainage layer gravel with a dedicated CQA technician; <br /> b. a liner leak test over the entire base liner to be performed after installation of the gravel <br /> drainage layer and the operations layer; and <br /> c. during placement of the first layer of waste in a new unit, site personnel will monitor <br /> waste placement and will exclude materials that could threaten the liner. <br /> 56. Construction will proceed only after all applicable construction quality assurance plans have <br /> been approved by Executive Officer. <br /> 57. The discharger proposed to construct two Class II surface impoundments to contain and <br /> evaporate leachate from solid waste management units. An engineered alternative to the <br /> prescriptive liner requirements of Title 27 is proposed for the Class II Surface <br /> Impoundments. The engineered alternative consists of from the top down: <br /> a. A primary 60-mil-thick High Density Polyethylene (HDPE) geomembrane <br /> b. A geonet drainage layer, as a Leachate Collection and Removal System(LCRS) <br /> c. A secondary 60-mil-thick HDPE geomembrane and <br /> is d. A GCL in place of the compacted clay liner. <br />