My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2003-0049 -11- <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 52. The leachate collection and removal system(LCRS)will consist of a 12-inch gravel layer <br /> with six-inch PVC lateral pipe and headers. The drainage layer will be installed at a <br /> minimum 2%grade with collection pipes placed on approximately 200-foot centers. <br /> Calculated peak daily leachate generation was 4,073 gallons/acre or approximately 0.0045 <br /> cubic feet per second. Daily peak head on the liner system was calculated to be <br /> approximately 1.6 inches. <br /> 53. A pan lysimeters will be installed beneath the landfill leachate sumps for the purpose of <br /> vadose zone monitoring. The proposed design for the pan lysimeters consists of, in <br /> ascending order: a prepared subgrade; a 24-inch thick, low-permeability soil layer(minimum <br /> permeability of 1 X 10"7 cm/sec) or a GCL liner; a 60-mil high density polyethylene (HDPE) <br /> geomembrane; a gravel filled pan lysimeter with access pipe; a GCL liner; a 60-mil high <br /> density polyethylene(HDPE) geomembrane; a gravel filled LCRS sump with access pipe; an <br /> 8-ounce/square yard separator geotextile; and a 12-inch thick protective cover soil operations <br /> layer. <br /> 54. Forward landfill has a vadose-zone monitoring network of twelve suction lysimeters and two <br /> pan lysimeters; the Austin Road landfill is an unlined facility and has no active vadose-zone <br /> monitoring. <br /> 55. The Discharger proposes the following construction quality assurance protocols for liner <br /> construction: <br /> a. monitor placement of drainage layer gravel with a dedicated CQA technician; <br /> b. a liner leak test over the entire base liner to be performed after installation of the gravel <br /> drainage layer and the operations layer; and <br /> c. during placement of the first layer of waste in a new unit, site personnel will monitor <br /> waste placement and will exclude materials that could threaten the liner. <br /> 56. Construction will proceed only after all applicable construction quality assurance plans have <br /> been approved by Executive Officer. <br /> 57. The discharger proposed to construct two Class II surface impoundments to contain and <br /> evaporate leachate from solid waste management units. An engineered alternative to the <br /> prescriptive liner requirements of Title 27 is proposed for the Class II Surface <br /> Impoundments. The engineered alternative consists of from the top down: <br /> a. A primary 60-mil-thick High Density Polyethylene (HDPE) geomembrane <br /> b. A geonet drainage layer, as a Leachate Collection and Removal System(LCRS) <br /> c. A secondary 60-mil-thick HDPE geomembrane and <br /> is d. A GCL in place of the compacted clay liner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.