Laserfiche WebLink
FORWARD y'r <br />PRELIMINARY <br />-y -. •.... -i••.- MAINTENANCE l y <br />AMENDMENT <br />SECTION <br />Closure Stage I <br />PAGE <br />1.0 PRELIMINARY <br />CLOSURE PLAN AMENDMENT <br />1 <br />1.1 <br />Introduction <br />1 <br />1.2 <br />Closure Sequencing <br />2 <br />1.3 <br />Maximum Extent of Landfill That Will Ever Require Closure <br />5 <br />1.4 <br />Closure Implementation <br />5 <br />1.5 <br />Estimate of Closure Date <br />7 <br />1.6 <br />Site Security <br />7 <br />1.7 <br />Post Closure End Use <br />7 <br />1.8 <br />Closure Cost Estimate <br />7 <br />1.8.1 Final Cover <br />8 <br />1.8.2 Final Cover Construction Quality Assurance <br />Monitoring and Testing <br />8 <br />1.8.3 Drainage Control System <br />8 <br />1.8.4 Landscaping and Erosion Control <br />9 <br />1.8.5 Gas Control System <br />9 <br />1.8.6 Site Security <br />9 <br />1.8.7 Demolition <br />9 <br />1.8.8 Gas Migration Monitoring System <br />9 <br />1.8.9 Groundwater Monitoring System <br />9 <br />1.8.10 Engineering Design <br />9 <br />1.8.11 Construction Management <br />9 <br />1.8.12 Partial Final Closure and Post -Closure Maintenance <br />Plan Preparation <br />10 <br />1.8.13 Contingency <br />10 <br />1.9 <br />Post -Closure Maintenance Cost Estimate <br />10 <br />1.10 <br />Demonstration of Financial Assurance <br />10 <br />1.11 <br />California Environmental Quality Act Documentation <br />10 <br />2.0 PRELIMINARY <br />POST -CLOSURE MAINTENANCE PLAN AMENDMENT <br />11 <br />3.0 PROFESSIONAL CERTIFICATION OF ACCURACY <br />13 <br />Figure 1 <br />Closure Stage I <br />Figure 2 <br />Closure Stage II <br />Figure 3 <br />Closure Stage III <br />Forward Landfill - PCPCMP Amendment No. 3 SWT Engineering <br />Z:\PROJECTS\Allied Waste\Forward\1N81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 TOC.doc; <br />Amend. No. 3: 12/18/2008 <br />