Laserfiche WebLink
C7 <br />FORWARD LANDFILL <br />PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCPLAN <br />AMENDMENT <br />If:1.111 r <br />Figure 4 Closure Stage IV <br />Figure 5 Closure Stage V <br />Figure 6 Closure Stage VI <br />Figure 7 Closure Stage VII <br />Figure 8 Closure Stage VIII <br />Figure 9 Final Cover Transition Between Lined Area Stages Typical Bench Detail <br />TABLES <br />Table 1 Staged Closure Matrix <br />Table 2 Closure Implementation Schedule - 187.6 -Acre Closure Area <br />Table 3 Closure Cost Estimate Summary - 187.6 -Acre Closure Area <br />Table 4 Annual Post -Closure Maintenance and Monitoring Cost Estimate Summary <br />ATTACHMENT <br />Attachment 1: Stage I Closure Area Site Life Calculations <br />Attachment 2: Stage IA Partial Final Closure/Post-Closure Maintenance Plan <br />(dated June 2005) - Text/Tables/Figures only <br />Forward Landfill - PCPCMP Amendment No. 3 SWT Engineering <br />Z:\PROIECTS\Al lied Waste\Forward\1N81013 5 yr Review Plan\1TD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 TOC.doc <br />Amend. No. 3:12/18/2008 <br />