0 Post -Closure Cost Estimate <br />n <br />The 2002 post -closure cost estimate was updated to reflect 2008 costs and includes <br />the newly required additional back-up cost information under 27 CCR. It was <br />determined that no changes to the post -closure cost estimate are necessary to <br />implement the staged closure of the FL. The 2008 post -closure cost estimate is <br />included herein as Table 4. Once a given stage is completed and the area is certified <br />as closed, then post -closure maintenance activities consistent with the 2002 PCPCMP <br />and Amendments will commence. Post -closure activities will be conducted for a <br />minimum of 30 years or until the operator can demonstrate that the site no longer <br />poses a threat to the public and the environment. <br />m <br />SWT Engineering <br />Forward Landfill - PCPCMP Amendment <br />(Z:\PROJECTS\Al lied Waste\Forward\JN81013 5 yr Review Plan\)TD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 121808.doc: <br />Amendment No. 3: 12/18/08) <br />