Laserfiche WebLink
2.0 PRELIMINARY POST -CLOSURE MAINTENANCE PLAN AMENDMENT <br />The 2002 Preliminary Plan prepared by BAS, Lewis Engineering, and GLA was updated <br />with Amendment No. 4 of the PCPCMP. A copy of the updated post -closure <br />maintenance cost estimate is included as Table 4 and matches the estimate <br />presented in Amendment No. 4 of the 2002 PCPCMP. <br />The FL will be closed in nine stages over the life of the landfill. Upon completion of <br />closure construction activities and certification, partial closure post -closure monitoring <br />and maintenance will begin. Post -closure monitoring and maintenance procedures <br />are outlined in the 2002 PCPCMP. The following discussion presents items of special <br />note which will be carried out during the post -closure maintenance period in support of <br />each staged closure area where appropriate: <br />Landfill Gas Control and Monitoring <br />The landfill gas control system will be expanded as the FL is developed. Therefore, the <br />gas control system will be placed prior to completion of each staged closure area. The <br />system will be modified as discussed in this Amendment (Amendment No. 3) and the <br />2002 PCPCMP to accommodate placement of the final cover during Stage VII. <br />Permanent gas migration monitoring probes have already been installed around the <br />perimeter of the refuse footprint in accordance with 27 CCR. Additional probes may <br />be added as necessary. <br />Surface, subsurface and system monitoring and control system adjustments/ <br />modifications will be conducted during post -closure maintenance to provide <br />compliance with applicable regulations. <br />Settlement Monitoring <br />Two permanent survey monuments will be installed during closure of Stage I. An aerial <br />survey will be conducted upon completion of each closure stage and once thereafter <br />every five years during the post closure maintenance period to track settlement. If <br />additional fill contour information is needed, it should be noted that aerial flyovers will <br />be conducted annually throughout active refuse disposal operations. <br />Stormwater Management <br />As part of routine site maintenance, all stormwater control system features will be <br />inspected and repaired as necessary. Special attention will be given to those interim <br />and/or permanent stormwater control system features which divert, gather and/or <br />control run-on to the staged closure areas. Drainage control system which features <br />the final stage closure will be integrated with the interim features utilized during active <br />operations. <br />11 SWT Engineering <br />Forward Landfill - PCPCMP Amendment <br />(Z:\PROJECTS\Al lied Waste\Forward\JN81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 121808.doc; <br />Amendment No. 3: 12/18/08) <br />