Laserfiche WebLink
STAGE IA <br />PARTIAL <br />A 1j FINAL r <br />POST-CLOSURE <br />te:.+. MAINTENANCE <br />FOR THE <br />FORWARD LANDFILL <br />SECTION <br />PAGE <br />3.2.2 Final Cover Construction <br />3-4 <br />3.2.3 Final Cover Transitions <br />3-6 <br />3.2.4 Sources of Cover Material <br />3-6 <br />3.2.5 Final Cover Construction Quality Assurance <br />3-6 <br />3.3 <br />Final Grading <br />3-6 <br />3.4 <br />Landfill Settlement <br />3-7 <br />3.4.1 Settlement Analysis <br />3-7 <br />3.4.2 Survey/Settlement Monumentation <br />3-8 <br />3.5 <br />Landfill Slope Stability <br />3-9 <br />3.6 <br />Drainage and Erosion Control <br />3-10 <br />3.6.1 Drainage Control System Design <br />3-10 <br />3.6.1.1 Hydrology <br />3-11 <br />3.6.1.2 Proposed Final Drainage Control System <br />3-11 <br />3.6.2 Soil Loss Analysis <br />3-12 <br />3.6.3 Erosion Control <br />3-13 <br />3.7 <br />French Drain Liquid Seep Collectors <br />3-13 <br />3.8 <br />Landfill Gas Control <br />3-14 <br />3.9 <br />Landfill Gas Monitoring System <br />3-15 <br />3.10 <br />Groundwater/Surface Water Monitoring System <br />3-15 <br />3.11 <br />Site Security <br />3-16 <br />3.12 <br />Structure Removal/Decommissioning of Environmental <br />Control Systems <br />3-16 <br />3.13 <br />Closure Implementation Schedule <br />3-16 <br />3.13.1 Closure Process 3-16 <br />3.13.2 Construction Schedule 3-17 <br />3.13.3 Construction Management 3-17 <br />4.0 POST -CLOSURE MAINTENANCE PLAN 4-1 <br />4.1 Introduction 4-1 <br />is 4.2 Final Cover Maintenance 4-1 <br />Forward Landfill PFCPCMP 11 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-Toc.Doc:06/16/08 <br />