Laserfiche WebLink
STAGE IA PARTIAL FINAL CLOSURE AN <br />POST -CLOSURE MAINTENANCE PLAN <br />FOR <br />FORWARD <br />4.3 Drainage System Maintenance <br />4.4 Vegetative Cover Maintenance <br />4.5 French Drain Liquid Seep Collector Maintenance <br />4.6 Bench Maintenance <br />4.7 Landfill Settlement Monitoring and Monument Maintenance <br />4.7.1 Survey Record <br />4.7.2 Survey/Settlement Monuments <br />PAGE <br />4-2 <br />4-2 <br />4-2 <br />4-3 <br />4-3 <br />4-3 <br />4-3 <br />5-1 <br />5.1 <br />Purpose and Scope <br />5-1 <br />5.2 <br />Site Safety Officer <br />5-1 <br />5.3 <br />Emergency Response Notification Procedure <br />5-1 <br />5.4 <br />Emergency Response Procedures <br />5-2 <br />5.5 <br />Fire and/or Explosions <br />5-3 <br />5.6 <br />Flood <br />5-3 <br />5.7 <br />Earthquake <br />5-4 <br />5.8 <br />Surface Drainage Problems <br />5-4 <br />5.9 <br />Vandalism <br />5-5 <br />5.10 <br />Underground Fires <br />5-5 <br />5.11 <br />Emergency Response Plan Orientation <br />5-5 <br />5.12 <br />Evacuation Procedures <br />5-6 <br />5.13 <br />Medical Care Procedures <br />5-6 <br />5.14 <br />Amendments to the Emergency Response Plan <br />5-6 <br />6.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATE <br />6-1 <br />6.1 <br />Introduction <br />6-1 <br />6.2 <br />Closure Cost Estimate <br />6-1 <br />6.2.1 Final Cover <br />6-1 <br />6.2.1.1 Final Cover Construction Quality Assurance <br />Monitoring and Testing <br />6-1 <br />6.2.2 Drainage Control System <br />6-2 <br />6.2.3 Erosion Control <br />6-2 <br />6.2.4 Landfill Gas Control System <br />6-2 <br />Forward Landfill PFCPCMP III <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-Toc.Doc:06/16/08 <br />