Laserfiche WebLink
STAGE IA <br />PARTIAL i `lPOST-CLOSURE MAINTENANCE PLAN <br />R THE Ii <br />FORWARD LANDFILL <br />LIST OF TABLES <br />Table 1 Existing/Proposed Groundwater Monitoring Well Network <br />Table 2 Groundwater Analytical Parameters and Methods <br />Table 3 Vadose Zone and Surface Water Monitoring Network <br />Table 4 Landscape Seed Mix <br />Table 5 Closure Implementation Schedule <br />Table 6 Closure Cost Estimate Summary <br />Table 7 Cost Disbursement Schedule <br />Table 8 Annual Post -Closure Maintenance and Monitoring Cost Estimate <br />Summary <br />Figure 1 <br />Closure Stages Plan <br />Figure 2 <br />Adjacent Land Uses <br />Figure 3 <br />Figure 4 <br />Gas System Plan <br />Groundwater, Surface Water, Lysimeter Monitoring Locations <br />Drawing 4 <br />Closure Grading Plan <br />LIST OF APPENDICES <br />Appendix A <br />Alternative Final Cover Evaluation <br />Appendix B <br />Settlement Analysis <br />Appendix C <br />Slope Stability Analysis <br />Appendix D <br />Hydrology <br />Appendix E <br />Downdrain Hydraulic Calculations <br />Appendix F <br />Soil Loss Analysis <br />Drawing 1 <br />Title Sheet <br />Drawing 2 <br />Site and Index Map <br />Drawing 3 <br />Closure Grading Plan <br />Drawing 4 <br />Closure Grading Plan <br />Drawing 5 <br />Closure Grading Plan <br />Drawing 6 <br />Closure Grading Plan <br />Drawing 7 <br />Closure Grading Plan <br />Forward Landfill PFCPCMP v <br />Z:\PROJECTS\Hllied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-Toc.Doc:06/16/08 <br />