Laserfiche WebLink
STAGE IA PARTIAL FINAL CLOSURE ANX <br />POST -CLOSURE MAINTENANCE PLAN <br />FOR THE <br />FORWARD <br />SECTION <br />PAGE <br />6.2.5 Landfill Gas Monitoring System <br />6-2 <br />6.2.6 Groundwater Monitoring System <br />6-2 <br />6.2.7 French Drain Leachate Seep Collectors <br />6-2 <br />6.2.8 Site Security/Signage <br />6-2 <br />6.2.9 Structure Removal/Decommissioning of <br />Environmental Control Systems <br />6-3 <br />6.2.10 Engineering Design <br />6-3 <br />6.2.11 Construction Management <br />6-3 <br />6.2.12 Contingency <br />6-3 <br />6.3 <br />Disbursement of Funds <br />6-3 <br />6.4 <br />Post -Closure Maintenance Cost Estimate <br />6-4 <br />6.5 <br />Demonstration of Financial Responsibility <br />6-5 <br />7.0 PROFESSIONAL <br />CERTIFICATION OF ACCURACY <br />7-1 <br />8.0 RECORDKEEPING <br />8-1 <br />8.1 <br />Operating Record <br />8-1 <br />8.2 <br />Location and Inspection of Operating Records <br />8-1 <br />U <br />9.0 REFERENCES <br />9-1 <br />Forward Landfill PFCPCMP iv <br />Z:\PROJECTSWIIied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-Toc.Doc:06/16/08 <br />