Laserfiche WebLink
0 6.2.2 DRAINAGE CONTROL SYSTEM <br />Costs for the drainage system include the construction of the AC downdrains, <br />inlet structures, and deck berm. <br />6.2.3 EROSION CONTROL <br />This category covers the cost of landscaping which includes soil preparation <br />and planting of vegetative materials and installation of erosion control <br />devices. <br />6.2.4 LANDFILL GAS CONTROL SYSTEM <br />This category includes the cost for phased removal and reinstallation of the <br />existing landfill gas system header and reconnection of wells during grading <br />and final cover construction in the Stage IA partial closure area. <br />6.2.5 LANDFILL GAS MONITORING SYSTEM <br />0 <br />No costs are associated with this category since no additional gas monitoring <br />g <br />facilities are proposed for the closure of Stage IA. <br />6.2.6 GROUNDWATER MONITORING SYSTEM <br />No costs are associated with this category since no additional groundwater <br />monitoring facilities are proposed for closure of Stage IA. <br />6.2.7 FRENCH DRAIN LEACHATE SEEP COLLECTORS <br />This category includes costs for installation of the french drain leachate seep <br />collectors in the Stage IA partial closure area. <br />6.2.8 SITE SECURITY/SIGNAGE <br />No costs are associated with this category since additional fencing and <br />signage is not required for closure of Stage IA. <br />Forward Landfill PFCPCMP 6-2 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 6.doc: 6/16/2008 <br />