My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2.9 STRUCTURE REMOVAUDECOMMISSIONING OF ENVIRONMENTAL <br />0 CONTROL SYSTEMS <br />No costs are associated with this category since no structure removal or <br />decommissioning of environmental systems is required for closure of Stage <br />IA. <br />6.2.10 ENGINEERING DESIGN <br />This category includes costs for the preparation of construction level <br />engineering design plans and specifications for bid purposes. This cost is <br />assumed to be two percent of the construction cost. <br />6.2.11 CONSTRUCTION MANAGEMENT <br />The construction management cost for the Stage IA closure is based on the <br />closure construction period. This cost is assumed to be 4 percent of the <br />construction cost. <br />0 6.2.12 CONTINGENCY <br />n <br />A 20 percent contingency factor has been added to the construction cost <br />estimate. <br />In accordance with 27 CCR, Section 21800, the operator is required to <br />provide a detailed schedule for disbursement of funds for closure for advance <br />payment of closure construction activities to be performed in accordance with <br />the Plan or reimbursement of costs to be performed in accordance with the <br />Plan. Table 7 shows the anticipated disbursement of funds necessary to <br />complete construction for Stage IA partial closure area of the Forward <br />Landfill. Forward Landfill Inc. will request a release of funds from the CIWMB <br />Financial Assurance Branch prior to the start of closure construction <br />activities. <br />Forward Landfill PFCPCMP 6-3 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 6.doc: 6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.