My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 6.4 POST -CLOSURE COST ESTIMATE <br />C7 <br />The post -closure maintenance cost estimate has been prepared utilizing <br />information contained in Section 4.0 and estimates of manpower, materials <br />and equipment to maintain the Forward Landfill in compliance with current <br />applicable regulations. <br />The total annual maintenance and monitoring cost estimate for post -closure is <br />shown on Table 8. These costs are projected in 2005 dollars, assuming no <br />change in the regulatory environment with respect to the Forward Landfill. The <br />total 30 -year post -closure maintenance cost estimate shown on Table 8, was <br />calculated by multiplying the annual cost estimate by 30. The total 30 -year <br />post closure cost obligation does not factor in inflation or interest over the <br />funding period. The actual future value of the 30 -year total may be different. <br />Annual funding will be calculated year to year in accordance with 27CCR, <br />Section 22225. <br />The post -closure cost estimate does not include the items listed below as those <br />costs will be handled as part of ongoing landfill operations. <br />• Landfill Gas Control System Monitoring and Maintenance <br />• Groundwater Monitoring System Maintenance and Repair <br />• Groundwater Monitoring <br />• Stormwater Monitoring <br />• Site Security <br />It should be noted that the maintenance and monitoring costs presented have <br />been projected utilizing current regulations and applicable requirements. In <br />the event that changes occur in the regulatory conditions pertaining to the <br />Forward Landfill, these estimates will be adjusted accordingly, if necessary, <br />and submitted to the CIWMB, LEA and RWQCB. <br />Forward Landfill PFCPCMP 6-4 <br />Z:\PROJECTS\Al lied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 6.doc: 6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.