0 6.4 POST -CLOSURE COST ESTIMATE <br />C7 <br />The post -closure maintenance cost estimate has been prepared utilizing <br />information contained in Section 4.0 and estimates of manpower, materials <br />and equipment to maintain the Forward Landfill in compliance with current <br />applicable regulations. <br />The total annual maintenance and monitoring cost estimate for post -closure is <br />shown on Table 8. These costs are projected in 2005 dollars, assuming no <br />change in the regulatory environment with respect to the Forward Landfill. The <br />total 30 -year post -closure maintenance cost estimate shown on Table 8, was <br />calculated by multiplying the annual cost estimate by 30. The total 30 -year <br />post closure cost obligation does not factor in inflation or interest over the <br />funding period. The actual future value of the 30 -year total may be different. <br />Annual funding will be calculated year to year in accordance with 27CCR, <br />Section 22225. <br />The post -closure cost estimate does not include the items listed below as those <br />costs will be handled as part of ongoing landfill operations. <br />• Landfill Gas Control System Monitoring and Maintenance <br />• Groundwater Monitoring System Maintenance and Repair <br />• Groundwater Monitoring <br />• Stormwater Monitoring <br />• Site Security <br />It should be noted that the maintenance and monitoring costs presented have <br />been projected utilizing current regulations and applicable requirements. In <br />the event that changes occur in the regulatory conditions pertaining to the <br />Forward Landfill, these estimates will be adjusted accordingly, if necessary, <br />and submitted to the CIWMB, LEA and RWQCB. <br />Forward Landfill PFCPCMP 6-4 <br />Z:\PROJECTS\Al lied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 6.doc: 6/16/2008 <br />