Laserfiche WebLink
Conditions for N-339-17-10 (continued) <br />Page 3 of 9 <br />24. The facility shall install and maintain its pnircr operating condition a gas flow rneter with a continuous recording <br />device which measures the amount of landfill gas consumed in the flares and the amount of landfill gas controlled by <br />the CAS per day, each. [District NSR Rule] FcdvzAlly Enforceable Through Title V Permit <br />25. The flares shall be equipped with a temperature indicator and recorder that measures and records the operating <br />temperature. The temperature indicator and recorder must operate continuously. [District NSR Rule] Federally <br />i nforceable Throat h'l'itic V Permit <br />26. The enclosed flares shall he equipped with automatic dampers, an automatic shutdown device, and a Flame arrester. <br />f Nitrict NSR Ruh;) Federally Enforceable Through Title V Permit <br />27. 'Che enclosed flares shall bc: equipped with an LPG or.natural gas fired pilot. [District NSR Rule] Federally <br />Ea forceable Through Title.V Permit <br />28. Source testing on tete flares shall be performed to demonstrate compliance with the NOx and CO limits, and the VOC <br />destruction efficiency of 98% or 20 ppmv C� 3% oxygen (as.hexane) as required by this permit shall he conducted <br />annually. [District NSR Rulc] Federally 1: nforceahle Through Title V Permit <br />29. Source testing for NOx shall be conducted using CARR Method 7 or Method 20. [District Rule 10811 federally <br />Enforceable Through Title V Permit <br />30. Source testing for CO shall be conducted using 11'A Method 10 or 1013, CAR13 Methods I through 5 with 10, or <br />CAR13 Method 100. [District Mule 1081 ] Federally Friforccable Through Title V Permit <br />31. VOC emissions shall be mursured by FPA Method 18, 25, 25A, or 25C. [District Rule 1081] Federally Enforceable <br />Through Titic V Permit <br />32. H2S concentration of the: influent landfill gas to the flares shall not exceed 46.9 ppmv. [District NSR Rule] federally <br />Enforceable Through Title V Pennit <br />33. Gas combusted in the flares shall be tested for H2S content on a quarterly basis using draeger tubes. If compliance is <br />.hewn for two consecutive quaartcrs, the testing frequency may be changed to annual. Quarterly testing shall resume if <br />any annual test shows noncompliance. [District Rule 10811 Federally Enforceable'Through Title V Permit <br />04. Upon receiving an approval plats for closure, or partial ,closure, the: operawr shall modify this operating permit to <br />comply with the requirements of District Rule 4642. (District lade 4642, 3.2 and 4.1.11 federally Enforceable Through <br />Title V Permit <br />35. Lias collection system shall be operated in a manner which maximizes the amount of landfill gas extracted while <br />preventing overdraw that can cause fres or damage the gas collection system. [District NSR Rule] Fedemlly <br />Enforceable Through Title V Permit <br />36. During maintenance of the gas collection system or incineration device, emissions of'landfill gas shall be minimized <br />during shutdown. [District NSR .Rule] Federally Enforceable Through Title V Permit <br />37. Maintenance is defined as work performed on a gas collection systcm and/or control device in order to ensure <br />continued compliance with District rules, regulations, and/or Permits to Operate, and to prevent its failure or <br />malfunction. [District NSR Rule] Federally Enforceable Through Title V Permit <br />38. The pennittee shall notify the APCO by telephone at least 24 hours bcfom performing any maintenance work that <br />requires the system to he shutdown. The notification shall include a description of work, the date work will be <br />performers and the amount of time needed to complete the maintenance work. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />39. Permittee shall maintain records of system inspections including: date, time and inspection results. [District Rule 1070] <br />Federally Enforceable Through Title V Permit <br />40. Pennittee shall maintain records of maintenance related or other collection system and control device downtime, <br />including individual well shutdown. (District Rule 10701 Federally Enforceable Through Titley Permit <br />41. The operator shall record emission control device source tests (emissions of CO, NOx, and VOC) in pounds per <br />MMbtu heat input. Operator shall also rcuord VOC destruction/treatment efficiency. [District Rule 1081] Federally <br />Entorceable Through Title V Permit <br />CONDITIONS CONTINUE ON NEXT PAGE <br />