Laserfiche WebLink
Consolidated Forward Inc. Landfill <br />Page 22 <br />Benchmarks shall be established (these could utilize monitoring well top of casing elevations), <br />which will allow for determinations of settlement/consolidation of fill materials in closed <br />sections of the landfill on an annual basis and following significant seismic events (Modified <br />Mercalli Scale of V or above). In the event that changes are noted, the cause should be <br />determined as should the effect on leachate collection and recovery systems. Repair liners and <br />LCRS as necessary. In addition, remedial grading should be accomplished to restore the <br />original cap's function to repel water and direct surface runoff. <br />H. BIOLOGICAL RESOURCES <br />61(H.2) <br />Identified in This EIR: <br />Night lighting with sodium lamps with sharp cutoff angles shall be used to focus <br />light in active landfill areas (target areas) and to avoid nighttime lighting of adjacent <br />open areas and trees. <br />62 (H.3) <br />Proposed as Part of the Project: <br />As a participant in the SJCMSCP, Forward will incorporate SJCMSCP guidelines <br />developed to minimize effects of rodenticides to the garter snake, the brush rabbit <br />and the Swainsori s Hawk (Appendix A of the SJCMSCP). <br />Identified in This EIR: <br />Rodenticides and methods of application used at the landfill shall be reviewed by a <br />qualified biologist to determine if they reflect the most effective and safe methods for <br />controlling rodents. That biologist shall make recommendations for improvement if <br />needed. <br />63 Austin 1994 (F1.a, F1.b, and F1.c) (similar but updated), Austin 2000 (F1.a) <br />(Creek realignment) Monitoring and maintenance for five years following construction. <br />64 Austin 2000 0.0 <br />Restoration of the riparian area shall include revegetation with trees, shrubs, and grasses <br />native to the area. Plantings shall have a minimum 80% survival after the first year, and <br />100 % survival thereafter, or shall have attained a 75% cover after three years and a 90 <br />cover after five years. Plantings shall be monitored each year and maintained as necessary <br />until success criteria have been met. In order to assure implementation, the Wetlands <br />Mitigation and Monitoring Plan shall be modified to include these criteria. <br />65 Austin 2000 (F1.a) <br />A 4.3 -acre detention basin will be constructed in the southwest corner of the project site, as <br />depicted on the project plans (Beck 1993). <br />66 Austin 1994 (F2.a) (similar), Austin 2000 (F2.a) <br />Under current project plans, 31 of the 32 valley oaks are along the perimeter of the site or are <br />in the designated wildlife preserve adjacent to the creek and would not be removed. <br />67 Austin 1994 (F2.b) (similar), Austin 2000 (F2.b) <br />