Laserfiche WebLink
CIWMP. The County is currently in the process of revising the CIWMP to <br /> • incorporate the Forward Landfill. The CIWMP is currently anticipated to be <br /> revised in August 2002. <br /> 2.5.4 FINANCIAL ASSURANCES <br /> Financial assurance mechanisms in the form of Certificates of Insurance are in <br /> place for the existing Austin Road Landfill and existing Forward Landfill individually. <br /> Financial assurance for the combined Forward Landfill facility is to be prepared. <br /> 2.5.5 OPERATING LIABILITY INFORMATION <br /> Operating liability insurance is in place for the existing Austin Road Landfill and <br /> existing Forward Landfill individually. Operating liability insurance for the <br /> combined Forward Landfill facility has been submitted. <br /> 2.5.6 AUSTIN ROAD INTERIM CLOSURE <br /> . The current SWFP for the Austin Road Landfill requires the existing landfill area <br /> to cease receiving waste by December 31, 2002 and then be closed, as well as <br /> requiring that a liner system be placed over the portions of the existing landfill <br /> planned for vertical expansion. However, interim closure of Austin Road will <br /> require the placement of sufficient refuse to achieve design grades. With the <br /> current daily tonnage limits at Austin Road, the required grades may not be <br /> achieved by December 31, 2002. Forward is in the process of designing and <br /> constructing the interim cover in accordance with RWQCB requirements. The <br /> current schedule, based on RWQCB requirements, is to complete the interim <br /> cover by November 15, 2002. However, if Forward is making satisfactory <br /> progress but has not completed construction of the interim cover by this date, <br /> Forward may request that the RWQCB, CIWMB and LEA allow a time extension <br /> beyond the December 31, 2002 SWFP deadline. The proposed process would <br /> include expediting groundwater corrective action measures by October 15, <br /> 2002, placing Interim Final Cover over areas that have achieved adequate <br /> grades, and hydroseeding those areas that are not yet to final grade and <br /> completing the Interim Final Cover as early in 2002 as possible. Implementation <br /> of improvements to the landfill gas monitoring and extraction system will also be <br /> • performed by October 31, 2002. <br /> Forward Landfill)7D 2-6 <br /> L\Allied\2000.193\Reports\JTD-PCPCMP 02Rev:Sec-2.Op6:05j22j02 <br /> Revision 1: 07/16/02 BRYAN A.STIRRAT&ASSOCIATES <br />