inspectors. The following sections identify the major elements that are included <br /> in the CQA Plan prepared for construction of the waste containment units. The <br /> CQA Plan will be prepared in accordance with a registered civil engineer or <br /> certified engineering geologist. The CQA Plan will conform to all of the <br /> requirements specified in 27 CCR, Section 20324 as outlined in this section. A <br /> CQA Plan for the final cover system has been prepared and is included in the <br /> PCPCMP. <br /> 5.4.2 RESPONSIBILITY AND AUTHORITY <br /> A registered civil engineer or certified engineering geologist designated as the <br /> CQA Manager will be in charge of observing the installation of the work, <br /> evaluating the materials for conformance with the plans and specifications, and <br /> all testing completed for the project during and after construction. Specifically, <br /> the CQA Manager will: <br /> • Review design plans and specifications for accuracy and completeness. <br /> • Prepare a schedule of CQA inspection activities and coordinate necessary <br /> CQA personnel to conduct inspections. <br /> • Review and interpret data and reports prepared by CQA inspection <br /> personnel. <br /> The CQA inspection personnel will perform various tests and observations <br /> during construction activities such as: <br /> • Verify that testing equipment is properly calibrated on a regular basis and <br /> document the calibration. <br /> • Accurately record test data and organize it in a manner that allows easy <br /> reference. <br /> • Evaluate the contractor's construction quality control plans to ensure that <br /> they meet or exceed the facility CQA Plan requirements. <br /> • Report observations and test results as the work progresses. <br /> The CQA inspection personnel will work under the supervision and guidance of <br /> the CQA Manager who will be responsible for verifying that all tests are <br /> conducted in accordance with American Society for Testing and Materials <br /> (ASTM) standards or other specified test methods, and that the proper test <br /> equipment is used. The results of all inspections, including work that is <br /> F onward I andfill JTD 5-27 <br /> L\A11ied\2000.193\ReportsJTD-PC PC NIP702:Sec-5.0:5,124/02 <br /> Revision 1:07,/16,/02 <br /> BRYAN A.STIRRAT S ASSOCIATES <br />