Laserfiche WebLink
unacceptable, will be reported to the CQA Manager. <br /> 5.4.3 PERSONNEL QUALIFICATIONS <br /> The CQA team will consist of a CQA Manager and inspectors whose <br /> qualifications will be as follows: <br /> 5.4.3.1 CQA MANAGER <br /> The CQA Manager will have formal academic training in engineering or geology <br /> and will be registered as a professional engineer or certified engineering <br /> geologist in the State of California. This person should have practical, technical, <br /> and managerial experience that will allow the CQA Plan to be properly <br /> implemented. The CQA Manager must be able to communicate effectively with <br /> landfill operations personnel, design engineers, and contractors to facilitate a <br /> clear understanding of construction activities and the CQA Plan. <br /> 5.4.3.2 CQA INSPECTION PERSONNEL <br /> CQA inspection personnel must have formal training and practical experience in <br /> inspecting and testing construction work relative to solid waste disposal sites, <br /> including conducting and recording inspection activities, preparing daily reports, <br /> and performing field tests. <br /> 5.4.4 INSPECTION ACTIVITIES <br /> Inspection activities will be performed by the CQA team throughout the <br /> construction of the landfill. These activities are divided into pre-construction, <br /> construction, and post-construction activities. <br /> 5.4.4.1 PRE-CONSTRUCTION <br /> Pre-construction inspection activities of the CQA team will generally include: <br /> • Review of design criteria, drawings, and specifications associated with <br /> construction of the landfill. <br /> • Inspection of materials proposed for construction. <br /> Forward Landfill JTD 5-28 <br /> L:\Allied\2000.193\Reports\JTD-PC PCMP702 Sec-5.0:5/24/02 <br /> Recision 1:07/16,/02 <br /> BRYAN A.BTIRRAT S ASSOCIATES <br />