My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_3 JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_3 JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:53:01 PM
Creation date
7/3/2020 10:49:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_3 JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
unacceptable, will be reported to the CQA Manager. <br /> 5.4.3 PERSONNEL QUALIFICATIONS <br /> The CQA team will consist of a CQA Manager and inspectors whose <br /> qualifications will be as follows: <br /> 5.4.3.1 CQA MANAGER <br /> The CQA Manager will have formal academic training in engineering or geology <br /> and will be registered as a professional engineer or certified engineering <br /> geologist in the State of California. This person should have practical, technical, <br /> and managerial experience that will allow the CQA Plan to be properly <br /> implemented. The CQA Manager must be able to communicate effectively with <br /> landfill operations personnel, design engineers, and contractors to facilitate a <br /> clear understanding of construction activities and the CQA Plan. <br /> 5.4.3.2 CQA INSPECTION PERSONNEL <br /> CQA inspection personnel must have formal training and practical experience in <br /> inspecting and testing construction work relative to solid waste disposal sites, <br /> including conducting and recording inspection activities, preparing daily reports, <br /> and performing field tests. <br /> 5.4.4 INSPECTION ACTIVITIES <br /> Inspection activities will be performed by the CQA team throughout the <br /> construction of the landfill. These activities are divided into pre-construction, <br /> construction, and post-construction activities. <br /> 5.4.4.1 PRE-CONSTRUCTION <br /> Pre-construction inspection activities of the CQA team will generally include: <br /> • Review of design criteria, drawings, and specifications associated with <br /> construction of the landfill. <br /> • Inspection of materials proposed for construction. <br /> Forward Landfill JTD 5-28 <br /> L:\Allied\2000.193\Reports\JTD-PC PCMP702 Sec-5.0:5/24/02 <br /> Recision 1:07/16,/02 <br /> BRYAN A.BTIRRAT S ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.