CQA for Final Cover Placement <br /> The construction specifications include a CQA Plan for final cover placement. <br /> A geotechnical CQA crew, working under the direction of a Geotechnical <br /> Engineer, will be on-site full-time during the placement of the final cover to <br /> monitor compliance with project requirements. The CQA personnel will <br /> have day-to-day responsibility to observe cover placement work and to test <br /> and evaluate whether the cover is constructed according to specifications. <br /> 1.5 'Estimate of Closure Date <br /> The landfill will be closed incrementally as each stage reaches final grades (spe`— <br /> T, _ Section 1.2). As discussed in Section 1.2, the first staged closure project wi# begin 'n <br /> 2006 and continue following the completion of each stage. It should be noted <br /> the base liner construction "Phases" do not correspond to the Closure Stage.`'in <br /> addition, the actual closure dates for each stage will depend primarily on the amount <br /> of refuse received over time, although operational factors and/or design <br /> considerations may also increase or decrease available air space which can also <br /> affect an individual staged closure date. Therefore, subsequent staged closure dates <br /> were not prepared for Stages II through VIII. Two years prior to reaching final fill <br /> elevation for each stage, a partial final closure plan will be prepared and submitted <br /> for review and approval from those regulatory agencies having jurisdiction over the <br /> FL. The overall site closure date as presented in the 2002 Closure Plan remains the <br /> same and will be the closure date for Stage VIII. <br /> 1.6 Site Security <br /> The FL is secured with perimeter fencing and locking gates. The FL is not open to <br /> the public so access to the staged closure areas will be limited to site personnel. <br /> The only foot, vehicle and/or equipment that will be allowed within the staged <br /> (partial) closure areas will be for post-closure monitoring and maintenance. <br /> 1.7 Post Closure End Use <br /> The post closure end use for the FL, which includes all staged closure areas, is non- <br /> irrigated open space. As the staged closure areas are completed, native <br /> vegetation will be planted which will provide erosion control. <br /> 1.8 Closure Cost Estimate <br /> In order to establish the basis for the proper level of funding for a landfill to be <br /> closed in increments over its active life, a closure sequence or staging plan must <br /> be prepared. Then, in order to meet 27 CCR requirements, the cost estimate must <br /> be based on the maximum extent or area of the landfill that would ever require <br /> closure. Since the FL is proposed to be closed in six stages, the basis of the <br /> closure cost estimate is the largest area requiring closure over the life of the landfill <br /> 7 <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FinalCPR.doc) <br />