My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CQA for Final Cover Placement <br /> The construction specifications include a CQA Plan for final cover placement. <br /> A geotechnical CQA crew, working under the direction of a Geotechnical <br /> Engineer, will be on-site full-time during the placement of the final cover to <br /> monitor compliance with project requirements. The CQA personnel will <br /> have day-to-day responsibility to observe cover placement work and to test <br /> and evaluate whether the cover is constructed according to specifications. <br /> 1.5 'Estimate of Closure Date <br /> The landfill will be closed incrementally as each stage reaches final grades (spe`— <br /> T, _ Section 1.2). As discussed in Section 1.2, the first staged closure project wi# begin 'n <br /> 2006 and continue following the completion of each stage. It should be noted <br /> the base liner construction "Phases" do not correspond to the Closure Stage.`'in <br /> addition, the actual closure dates for each stage will depend primarily on the amount <br /> of refuse received over time, although operational factors and/or design <br /> considerations may also increase or decrease available air space which can also <br /> affect an individual staged closure date. Therefore, subsequent staged closure dates <br /> were not prepared for Stages II through VIII. Two years prior to reaching final fill <br /> elevation for each stage, a partial final closure plan will be prepared and submitted <br /> for review and approval from those regulatory agencies having jurisdiction over the <br /> FL. The overall site closure date as presented in the 2002 Closure Plan remains the <br /> same and will be the closure date for Stage VIII. <br /> 1.6 Site Security <br /> The FL is secured with perimeter fencing and locking gates. The FL is not open to <br /> the public so access to the staged closure areas will be limited to site personnel. <br /> The only foot, vehicle and/or equipment that will be allowed within the staged <br /> (partial) closure areas will be for post-closure monitoring and maintenance. <br /> 1.7 Post Closure End Use <br /> The post closure end use for the FL, which includes all staged closure areas, is non- <br /> irrigated open space. As the staged closure areas are completed, native <br /> vegetation will be planted which will provide erosion control. <br /> 1.8 Closure Cost Estimate <br /> In order to establish the basis for the proper level of funding for a landfill to be <br /> closed in increments over its active life, a closure sequence or staging plan must <br /> be prepared. Then, in order to meet 27 CCR requirements, the cost estimate must <br /> be based on the maximum extent or area of the landfill that would ever require <br /> closure. Since the FL is proposed to be closed in six stages, the basis of the <br /> closure cost estimate is the largest area requiring closure over the life of the landfill <br /> 7 <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FinalCPR.doc) <br />
The URL can be used to link to this page
Your browser does not support the video tag.