My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Equipment Operators <br /> — Surveyors <br /> — Mechanics <br /> Construction Schedule <br /> The start of partial closure construction activities for the FL partial closure and <br /> maintenance areas will commence once refuse fill elevations in that area are <br /> achieved. Table 2 presents the anticipated closure construction period for the <br /> 217.8-acre closure area. Closure construction activities will include the following <br /> tasks: <br /> • Equipment Mobilization <br /> • Signage <br /> • Site Exploration and Survey <br /> • Structure Removal/Demolition (last phase only) <br /> • Excavation of Final Cover Soil (foundation and vegetative layers only) <br /> • Final Cover Placement (including geomembrane) <br /> • Landfill Gas System Modifications <br /> • Permanent Drainage Control Feature Installation <br /> • Drainage Control Systems Modifications <br /> • Seed and Mulch Installation <br /> • Demobilization <br /> Some of these activities will be conducted concurrently. <br /> Construction Management <br /> A construction management team will be on-site during the entire period of <br /> closure construction. The team will be under the direction of a Construction <br /> Manager, who will supervise construction of the various features included in the <br /> closure plan. The Construction Manager will coordinate the activities of the on-site <br /> contractor(s) and will provide liaison among Allied staff, the design engineers and <br /> the contractors. Other key staff may include a Site Engineer and Construction <br /> Inspector(s). A survey crew and a geotechnical CQA crew will be present, as <br /> required. <br /> Survey Control <br /> The survey control crew, under the direction of Allied, will be responsible for <br /> the surveyed location of the closure plan improvements and for record <br /> drawing information. They will be responsible for documenting that the <br /> various components of the cover conform to the grade and/or thickness <br /> requirements of the construction drawings and specifications. <br /> 6 <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FinalCPR.doc) <br />
The URL can be used to link to this page
Your browser does not support the video tag.