Laserfiche WebLink
2.0 PRELIMINARY POST-CLOSURE MAINTENANCE PLAN REVISION <br /> The following PCPCMPR for Forward Landfill (FL) augments the existing Preliminary <br /> Plan prepared by BAS, Lewis Engineering, and GLA (2002). <br /> The FL will be closed in eight stages over the life of the landfill. Upon completion of <br /> closure construction activities and certification, partial closure post-closure monitoring <br /> and maintenance will begin. Post-closure monitoring and maintenance procedures <br /> are outlined in the 2002 Preliminary Post-Closure Maintenance Plan. The following <br /> discussion presents items of special note which will be carried out during the post- <br /> closure maintenance period in support of each staged closure area where <br /> appropriate: <br /> Landfill Gas Control and Monitoring <br /> The landfill gas control system will be expanded as the FL is developed. Therefore, <br /> the gas control system will be placed prior to completion of each staged closure area. <br /> The system will be modified as discussed in the PCPCMPR and the 2002 Preliminary <br /> Closure Plan to accommodate placement of the final cover. <br /> Permanentas migration monitoring robes have already been installed around the <br /> g g gp Y <br /> perimeter of the refuse footprint in accordance with 27 CCR. Additional probes may <br /> be added as necessary. <br /> Surface, subsurface and system monitoring and control system adjustments/ <br /> modifications will be conducted during post-closure maintenance to provide <br /> compliance with applicable regulations. <br /> Settlement Monitoring <br /> Two permanent survey monuments will be installed during closure of Stage I. An <br /> aerial survey will be conducted upon completion of each closure stage and once <br /> thereafter every five years during the post closure maintenance period to track <br /> settlement. If additional fill contour information is needed, it should be noted that <br /> aerial flyovers will be conducted annually throughout active refuse disposal <br /> operations. <br /> Stormwater Management <br /> As part of routine site maintenance, all stormwater control system features will be <br /> inspected and repaired as necessary. Special attention will be given to those interim <br /> and/or permanent stormwater control system features which divert, gather and/or <br /> control run-on to the staged closure areas. Drainage control system which features <br /> the final stage closure will be integrated with the interim features utilized during <br /> active operations. <br /> 11 <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FinalCPR.doc) <br />