Post-Closure Cost Estimate <br /> No changes to the post-closure cost estimate are necessary to implement the staged <br /> closure of the FL. Once a given stage is completed and the area is certified as closed <br /> then post-closure maintenance activities consistent with the 2002 Preliminary Post- <br /> Closure Maintenance Plan will commence. Post-closure activities will be conducted <br /> for a minimum of 30-years or until the operator can demonstrate that the site no <br /> longer poses a threat to the public and the environment. <br /> 12 <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FinalCPR.doc) <br />