Laserfiche WebLink
FORWARD LANDFILL <br /> PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCE PLAN <br /> REVISION <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0 PRELIMINARY CLOSURE PLAN REVISION 1 <br /> 1.1 Introduction 1 <br /> 1.2 Closure Sequencing 1 <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure 4 <br /> 1.4 Closure Implementation 5 <br /> 1.5 Estimate of Closure Date 7 <br /> 1.6 Site Security 7 <br /> 1.7 Post Closure End Use 7 <br /> 1.8 Closure Cost Estimate 7 <br /> 1.8.1 Final Cover 8 <br /> 1.8.2 Final Cover Construction Quality Assurance <br /> Monitoring and Testing 8 <br /> 1.8.3 Drainage Control System 9 <br /> 1.8.4 Landscaping and Erosion Control 9 <br /> 1.8.5 Gas Control System 9 <br /> 1.8.6 Site Security 9 <br /> 1.8.7 Demolition 9 <br /> 1.8.8 Gas Migration Monitoring System 9 <br /> 1.8.9 Groundwater Monitoring System 9 <br /> 1.8.10 Engineering Design 9 <br /> 1.8.11 Construction Management 10 <br /> 1.8.12 Partial Final Closure and Post-Closure Maintenance <br /> Plan Preparation 10 <br /> 1.8.13 Contingency 10 <br /> 1.9 Post-Closure Maintenance Cost Estimate 10 <br /> 1.10 Demonstration of Financial Assurance 10 <br /> 1.11 California Environmental Quality Act Documentation 10 <br /> 2.0 PRELIMINARY POST-CLOSURE MAINTENANCE PLAN REVISION 11 <br /> 3.0 PROFESSIONAL CERTIFICATION OF ACCURACY 13 <br /> Forward Landfill- PCPCMPR <br /> (L\Allied\2003.003 Western Region\FORWARD\PCPCMPR\TOC.DOC) <br />