Laserfiche WebLink
FORWARD LANDFILL <br /> PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCE PLAN <br /> REVISION <br /> TABLE OF CONTENTS <br /> FIGURES <br /> Figure 1: Closure Stage I <br /> Figure 2: Closure Stage II <br /> Figure 3: Closure Stage III <br /> Figure 4: Closure Stage IV <br /> Figure 5: Closure Stage V <br /> Figure 6: Closure Stage VI <br /> Figure 7: Closure Stage VII <br /> Figure 8: Closure Stage VIII <br /> Figure 9: Final Cover Transition Between Lined Area Stages Typical Bench Detail <br /> TABLES <br /> Table 1: Staged Closure Matrix <br /> Table 2: Closure Implementation Schedule - 217.8-Acre Closure Area <br /> Table 3: Closure Cost Estimate Summary - 217.8-Acre Closure Area <br /> ATTACHMENT <br /> Attachment 1: Stage I Closure Area Site Life Calculations <br /> - <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\TOC.DOC) <br />