Laserfiche WebLink
t <br /> TABLE 1 <br /> FORWARD LANDFILL <br /> STAGED CLOSURE MATRIX <br /> DEVELOPMENT PHASE CLOSURE CLOSURE UNCAPPED AREA UNCAPPED AREA AT <br /> (LINER) LINER STAGE STAGE START OF CLOSURE STAGE <br /> PHASE AREA AREA CLOSURE STAGE COMPLETION <br /> 1,2,3,4 217.8 1 90.2 217.8 127.6 <br /> 5 13.8 II 5.6 141.4 135.8 <br /> 6 10.0 111 5.9 145. 139.9 <br /> 8 <br /> 7 19.3 IV 1 13.7 159.2 145.5 <br /> 8 19.4 V 11.8 164.9 153.1 <br /> 9 34.3 VI 20.7 187.4 166.7 <br /> Top Deck 0.0 Vll 166.7 166.7 0.0 <br /> 10 24.1 VIII 24.1 24.1 0.0 <br /> *Approximately 110+ acres are unlined. <br /> The site's closure staging was developed so as to not interfere with active disposal <br /> operations. <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial <br /> Final Closure as phased closure is implemented. Closure construction will begin <br /> with mobilization of equipment and materials. The type of equipment and <br /> required personnel expected to be utilized during closure construction includes, <br /> but is not limited to, the following: <br /> Equipment <br /> - Scrapers <br /> = <br /> Dozers <br /> Loaders <br /> - Compactors <br /> - Trucks <br /> - Soil Processing Equipment <br /> - Motor Grader <br /> - Water Truck <br /> • Personnel <br /> - Construction Manager <br /> - Field Inspector(s) <br /> - Site Engineer(s) <br /> - Geotechnical Technician(s) <br /> - Labor Crews <br /> 5 <br /> Forward Landfill-PCPCMPR <br /> (L:\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FinalCPR.doc) <br />