SEC'T'ION 7
<br /> References
<br /> Brian A. Stirrat Associates(BAS),Final Draft Joint Technical Document, Forward Landfill, August
<br /> 2001.
<br /> Bray, J.D., et at., "Simplified Seismic Design Procedure for Geosynthetic-Lined, Solid Waste
<br /> Landfills," Geosynthetics International, Vol. 5,Nos 1-2, 1998.
<br /> Carpenter,J.R. STABL5/PCSTABL5M User Manual,Informational Report for the Joint Highway
<br /> Research Project, Purdue University, May 1986.
<br /> CH2M HILL, Comprehensive Landfill Description, Forward Landfill Inc., January 1992.
<br /> CH2M HILL,Design and Construction Documents, WMUD-93,Forward Inc. Landfill, April 1993,
<br /> (1993a).
<br /> CH2M HILL, Report of Waste Discharge, 1993 Permit Revisions, Forward, Inc. Landfill, San
<br /> Joaquin County, California,June 1993, (1993b).
<br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward, Inc. Landfill, San
<br /> Joaquin County, California, September 1993, (1993c).
<br /> CH2M HILL, Construction Quality Assurance Report, WMUD-93, Forward, Inc.Landfill,January
<br /> l 994, (1994a).
<br /> CH2M HILL, Buena Vista Landfill, Module 3. Design, Construction, and Operations Documents.
<br /> Prepared for County of Santa Cruz,March 1994, (1994b).
<br /> CH2M HILL,Design and Construction Documents, WMUD-94,Forward Inc. Landfill,June 1994,
<br /> (I 994c).
<br /> CH2M HILL,Buena Vista Landfill, Module 3. Construction Quality Assurance Report. Prepared for
<br /> County of Santa Cruz,November 1994, (1994d).
<br /> CH2M HILL, Construction Quality Assurance Report, WMUD-94, Forward, Inc. Landfill, December
<br /> 1994, (1994d).
<br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc. Landfill, San
<br /> Joaquin County, California, Revised December 1994,(1994e).
<br /> CH2M HILL,Design and Construction Documents, WMUD-95, Forward Inc. Landfill, January
<br /> l 995, (1995a).
<br /> CH2M HILL, Construction Quality Assurance Report, WMUD-95, Forward Inc. Landfill, October
<br /> 1995, (1995b).
<br /> CH2M HILL, Clay Versus GCL Base Liner Memorandum, Figure 213,February 24, 1997, (1997a).
<br /> CH2M HILL, Design and Construction Documents, WMUD-97, Forward Inc. Landfill,April 1997,
<br /> (I 997b).
<br /> CH2M HILL, Construction Quality Assurance Report, WMUD-97, Forward Inc. Landfill, October
<br /> 1997, (1997c).
<br /> FORWARD LANDFILL WMU F-03 AND F-WEST DESIGN REPORT
<br /> 7-1
<br />
|