Laserfiche WebLink
SEC'T'ION 7 <br /> References <br /> Brian A. Stirrat Associates(BAS),Final Draft Joint Technical Document, Forward Landfill, August <br /> 2001. <br /> Bray, J.D., et at., "Simplified Seismic Design Procedure for Geosynthetic-Lined, Solid Waste <br /> Landfills," Geosynthetics International, Vol. 5,Nos 1-2, 1998. <br /> Carpenter,J.R. STABL5/PCSTABL5M User Manual,Informational Report for the Joint Highway <br /> Research Project, Purdue University, May 1986. <br /> CH2M HILL, Comprehensive Landfill Description, Forward Landfill Inc., January 1992. <br /> CH2M HILL,Design and Construction Documents, WMUD-93,Forward Inc. Landfill, April 1993, <br /> (1993a). <br /> CH2M HILL, Report of Waste Discharge, 1993 Permit Revisions, Forward, Inc. Landfill, San <br /> Joaquin County, California,June 1993, (1993b). <br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward, Inc. Landfill, San <br /> Joaquin County, California, September 1993, (1993c). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-93, Forward, Inc.Landfill,January <br /> l 994, (1994a). <br /> CH2M HILL, Buena Vista Landfill, Module 3. Design, Construction, and Operations Documents. <br /> Prepared for County of Santa Cruz,March 1994, (1994b). <br /> CH2M HILL,Design and Construction Documents, WMUD-94,Forward Inc. Landfill,June 1994, <br /> (I 994c). <br /> CH2M HILL,Buena Vista Landfill, Module 3. Construction Quality Assurance Report. Prepared for <br /> County of Santa Cruz,November 1994, (1994d). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-94, Forward, Inc. Landfill, December <br /> 1994, (1994d). <br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc. Landfill, San <br /> Joaquin County, California, Revised December 1994,(1994e). <br /> CH2M HILL,Design and Construction Documents, WMUD-95, Forward Inc. Landfill, January <br /> l 995, (1995a). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-95, Forward Inc. Landfill, October <br /> 1995, (1995b). <br /> CH2M HILL, Clay Versus GCL Base Liner Memorandum, Figure 213,February 24, 1997, (1997a). <br /> CH2M HILL, Design and Construction Documents, WMUD-97, Forward Inc. Landfill,April 1997, <br /> (I 997b). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-97, Forward Inc. Landfill, October <br /> 1997, (1997c). <br /> FORWARD LANDFILL WMU F-03 AND F-WEST DESIGN REPORT <br /> 7-1 <br />