Laserfiche WebLink
SECTION 6 <br /> Summary <br /> This report presents the construction documents and supporting design criteria required for <br /> completion of WMU FU-03 at the Forward Landfill. Design calculations have been performed and <br /> construction documents prepared to demonstrate that the design of this unit complies with Forward's <br /> WDRs, and Title 27 requirements. <br /> These Design and Construction Documents have been prepared by Lewis Engineering and Bryan A. <br /> Stirrat and Associates under the supervision of Bryan A. Stirrat whose seal as a Registered <br /> Professional Engineer in the State of California is affixed below. <br /> QRpF ESS/pN�! <br /> BRYAN A. Ftic2 <br /> STIRRAT m <br /> 22631 7D <br /> Exp. 12- -0 <br /> Bryan A. SAE-,F®¢ <br /> C.E. 22631 —Expires ecember 21, 2005 <br /> FORWARD LANDFILL WMU F-03 AND F-WEST DESIGN REPORT <br /> 6-1 <br />