Laserfiche WebLink
1VV-T CTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 52 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. November 5,2003 Wednesda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE SanBeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cool, overcast and Ken Davila <br /> CLAY breezy <br /> Equipment on site: <br /> 1-16G blade 1-backhoe, 1-633 scra er <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Arrived on site and met with the Sukut foreman to discuss the earthwork schedule for today. He stated <br /> that work on the lechate pond and on the access road would be performed throughout the day. Backfilling of <br /> the west FU-03 cell anchor trench was also performed in the morning on the northern half. The blade <br /> graded the access road and the scraper hauled stockpiled material to the access road. Installation by Sukut <br /> 0 and testing by BAS of the leachate pond lysimeters were completed by early to mid afternoon. GSE was <br /> informed to begin deployment. <br /> GSE deployed geocomposite on the southern half of the FU-03 cell west slope. In the mid afternoon, <br /> deployment began in the lechate pond. Eighteen(18)panels of GCL and twelve (12) panels of double <br /> textured 60 mil were placed along the west slope and northwest and southwest corners. <br /> AdIlk <br /> repared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />