17E TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> $1 <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 51 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. November 4, 2003 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Construction Sukut GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues I Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cool, clear and Ken Davila <br /> CLAY breezy <br /> Equipment on site: <br /> 1-16G blade, 1-backhoe, 1-633 scra er <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Sukut foreman to discuss the earthwork schedule for today. He stated <br /> that work on the lysimeters in the lechate pond and on the access road would be performed throughout the <br /> day. Backfilling of the west FU-03 cell anchor trench was also performed in the morning on the northern <br /> half. The blade graded the access road and in the afternoon, the scraper began hauling stockpiled material to <br /> the access road. <br /> GSE arrived on site and began deployment of the GCL and 60 mil liner on the southern half of the cell <br /> west slope. Air and vacuum box testing,repairs and destructive sample cutting were performed in the late <br /> afternoon. Sandbags were placed on and under the west toe of slope liner of the cell to protect the GCL <br /> beneath. Two(2)destructive samples were marked for testing at random locations. GSE cut their samples; <br /> their portions were tested and were within specification. <br /> Butch S. (Forward)stated that after the completed installation by Sukut, the lysimeters in the lechate pond <br /> would be tested in the afternoon by others. By shift's end,the installation and testing had not been <br /> completed. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_7 <br />