Laserfiche WebLink
V TV <br /> .-WTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 55 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. November 8,2003 Saturda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues I Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cold, overcast and Ken Davila <br /> CLAY wind <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After an early morning call from the GSE Foreman,I arrived on site to continue deployment observations <br /> and documentation of the secondary liner in the lechate pond. Thirteen(13)panels of GCL and ten(10) <br /> panels of double textured 60 mil HDPE were deployed on the south and east slopes and the southeast comer <br /> floor throughout the day. Air testing, vacuum box testing,patches and repairs were also performed. Five(5) <br /> destructive samples were marked at random locations, cut out by GSE and tested on site. All samples <br /> passed their required strength parameters. <br /> Review of the eight-ounce(8oz)geotextile certifications and documentation was completed by shift's <br /> end. This completed the review of all certifications of all on site materials. Reordered GCL for the five to <br /> one(5:1) slope will have new certifications that are scheduled to arrive with the roll shipment. These GCL <br /> rolls are scheduled to arrive on site on Monday(11-10-03)and will be documented then. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-1) <br />