TIECTOR <br /> ENGINEERING INC. <br /> DAILY <br /> CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 57 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan (Forward,Inc.) November 11, Tuesday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled,light brown silty Cool,clear and Ken Davila <br /> CLAY breezy <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for observations and documentation of the primary liner in the lechate pond. GSE <br /> completed deployment of the geonet above the secondary liner in the late morning. In the early afternoon, <br /> deployment of the primary 60 mil liner began. Eighteen(18)panels were deployed and seamed throughout <br /> 0 the remainder of the day's shift. Deployment began on the west slope working east to west and air testing <br /> was performed on the panels that were seamed. <br /> One worker was injured after slipping down the slope and had to be taken out by ambulance. <br /> Roll certifications for the GCL which arrived on yesterday have not been delivered to the project. <br /> Sukut's foreman was on site to discuss the pipe placement in the lechate pond sump and the subgrade <br /> conditions on the five to one(5:1)slope. He stated that he would not have the pipe welder and caps for the <br /> leachate sump until Wednesday or Thursday of this week. <br /> One depth check on the western 5:1 slope was performed for thickness at the request of Montie C., <br /> Vector's co-project manager. A three and a half foot hole was excavated by shovel and no refuse was <br /> encountered. Montie is scheduled to be on site for tomorrow's meeting. <br /> Adilk <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> C_,? <br />