My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TZECTOR <br /> ENGINEERING INC. <br /> DAILY <br /> CONSTRUCTION FIELD REP®RT <br /> Project Name: Project No. Daily Field Report Sequence Number. <br /> Forward Landfill 021605.03 60 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefani (Forward, Inc.) November 14, Friday <br /> 2003 <br /> General Contractor: Liner Contractor: project Engineer; <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liter Superintendent: off: <br /> Tim Sues Are Khounin <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,overcast and Ken Davila <br /> wind M-rain <br /> Equipment on site: <br /> 1-16G blade 1-633 sar 1-825 corn actor 1-watertruck <br /> NOTES(Describe work complied during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss today's deployment schedule. They continued <br /> deployment of the primary 60 mil single textured HDPE liner over the five to one(5:1)slope and over the <br /> north slope of the FU-03 cell. Twenty-five(25)panels of GCL and seventeen(17)panels of 60 mil were <br /> deployed and seamed. The crew stopped deployment and air testing in the early afternoon due to rain <br /> showers and began trash cleanup for a short time.Panels were deployed working east to west. The GSE <br /> foreman stated that he would be on site tomorrow morning to see if deployment of the geocomposite would <br /> be possible. <br /> Roll certifications for the GCL,which arrived on site Monday(11-10-03),have not yet been received. <br /> The GSE foreman stated that the certs would be FAXed to the Vector office before closing time. <br /> Sukut had baserock delivered to the site for the access road but the material was rejected because it was <br /> too fine in gradation. One scraper hauled stockpiled low permeability clay to the southwest comer of the <br /> cell floor in the morning and early afternoon. The rains stopped clay placement in the early afternoon. Six <br /> (6)nuclear moisture density tests were performed at random locations and elevations with all tests passing <br /> the required specifications in compaction and moisture content. The Sukut foreman was verbally informed <br /> of the test results. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of I <br /> C-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.