My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T TV "TOR <br /> ENGINEERf VQ INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 61 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefani(Forward,Inc.) November 15, Saturday <br /> 2003 <br /> General Contractor: Liner Contractor. Project Engineer: <br /> Sukut Construction GSE SanBeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,raining and Ken Davila <br /> breezy <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe worts completed during the day,any problems and their solutions): <br /> I arrived on site for observations and documentation at the location listed above. GSE began to deploy <br /> geocomposite on the north slopes of the FU-03 cell. Eight(8)rolls were placed and seamed until the mid <br /> morning. Rain halted further deployment and the GSE foreman shut the operation down for safety reasons. <br /> Calculations, nuclear density test location plotting and various field form completion were performed for <br /> the remainder of the day. <br /> Roll certifications for the GCL,which arrived on site Monday(11-10-03), were received at the Vector <br /> office before closing time yesterday. <br /> Sukut was not on site today. <br /> girprepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_? <br />
The URL can be used to link to this page
Your browser does not support the video tag.