Laserfiche WebLink
17ECTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 63 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan (Forward, Inc.) November 18, Tuesday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer. <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Warm,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> 1-16G blade 1-watertru21-smoothdrum roller <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site for observations and documentation at the location listed above. GSE continued <br /> deployment of GCL and 60 mil liner on the north slopes of the FU-03 cell. Eleven(11)panels of GCL and <br /> seven(7)panels of 60 mil were placed and seamed throughout the day. <br /> Sukut continued work on the access road, importing baserock and blading and compacting the road <br /> material. The laborers removed visquine off the east floor of the cell. <br /> The weekly meeting was held in the mid morning to discuss project progress and scheduling. The <br /> weather was of some concern for the upcoming daily deployment of liner and the drying of the existing <br /> subgrade. <br /> Prepared By Reviewed By: <br /> 4/23/03,Rev. 0 1 of I <br /> ra <br />