My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/24/03 MON 08:54 FAX 530 272 8533 VECTOR ENG'G 121002 <br /> 14� TOR <br /> ENGINEERNQ INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Numbcc <br /> Forward LF WMU FU-03 021605.03 62 <br /> Location of Work: Client Or Manager Date: Day of The Week <br /> WMU FU-03 Forward Landfill Inc. November 17,2003 Monda <br /> General Contractor. Liner Contractor: 'NEngineer. <br /> Sukut Const. GSE <br /> General Foreman: Liner Superintendent: Other. <br /> Source and ne-*cription of Fill Material: Weather. CQA Technician: <br /> Partly Cloudy—60's Bryan Fritrler <br /> Equipment on site: <br /> Road Grader,Forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> GSE placed geocomposite on the northwest side of the 2:1 slope. The geonet component of the <br /> geocomposite were fastened together with plastic tyes and the geotextile was sewn. CQA monitored the <br /> installation of the geocomposite. GSE conducted general clean-up of the area. GSE left the site at S <br /> approximately 1:30 pm. <br /> Sukut construction was placing aggregate base on the access road located southeast of the cell. Began <br /> removing the visqueen from the floor of the cell. No work was done by Sukut within the WMU FU-03 limits <br /> today. <br /> CQA walked the floor of the cell to observe the condition of the clay following the previous rains. The clay <br /> had been covered with visqueen,but areas were observed to be wet. CQA recommended that the visqueen <br /> be removed so that the clay can dry and be rolled with the smooth drum roller. <br /> Prepared By.., Reviewed By: <br /> 4/23/03,Rev.0 1 of I <br /> C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.