11/24/03 MON 08:54 FAX 530 272 8533 VECTOR ENG'G 121002 <br /> 14� TOR <br /> ENGINEERNQ INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Numbcc <br /> Forward LF WMU FU-03 021605.03 62 <br /> Location of Work: Client Or Manager Date: Day of The Week <br /> WMU FU-03 Forward Landfill Inc. November 17,2003 Monda <br /> General Contractor. Liner Contractor: 'NEngineer. <br /> Sukut Const. GSE <br /> General Foreman: Liner Superintendent: Other. <br /> Source and ne-*cription of Fill Material: Weather. CQA Technician: <br /> Partly Cloudy—60's Bryan Fritrler <br /> Equipment on site: <br /> Road Grader,Forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> GSE placed geocomposite on the northwest side of the 2:1 slope. The geonet component of the <br /> geocomposite were fastened together with plastic tyes and the geotextile was sewn. CQA monitored the <br /> installation of the geocomposite. GSE conducted general clean-up of the area. GSE left the site at S <br /> approximately 1:30 pm. <br /> Sukut construction was placing aggregate base on the access road located southeast of the cell. Began <br /> removing the visqueen from the floor of the cell. No work was done by Sukut within the WMU FU-03 limits <br /> today. <br /> CQA walked the floor of the cell to observe the condition of the clay following the previous rains. The clay <br /> had been covered with visqueen,but areas were observed to be wet. CQA recommended that the visqueen <br /> be removed so that the clay can dry and be rolled with the smooth drum roller. <br /> Prepared By.., Reviewed By: <br /> 4/23/03,Rev.0 1 of I <br /> C-2 <br />