il/E V CTOR <br /> EV <br /> pr ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 67 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan (Forward, Inc.) November 22, Saturday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-16G blade 1-water true 1-633 =!L i-backhoe I-!kiR loader 1-smoothdrum roller <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with Tim,the Sukut foreman,to view and discuss west FU-03 cell floor <br /> conditions and options to prepare it for liner deployment. In the early morning,they began work on the <br /> sump area and on the west floor. The skip loader ripped and graded the clay to expedite drying. After <br /> grading,they used the smoothdrum to roll the west floor to the west toe of slope. The blade and scraper <br /> graded and hauled material out of and around the sump. He also stated that they would be working <br /> tomorrow. <br /> The GSE foreman was on site and after visual recon on the west floor,began to deploy 60mil double <br /> textured HDPE. Two(2)panels were deployed, seamed and air tested on the west central floor in the <br /> morning. The GSE foreman stated that they would not deploy any more panels until the remainder of the <br /> floor was complete. He also stated that they would be working tomorrow in anticipation of Monday's <br /> predicted rain. After the two panels were deployed,the crew cleaned up trash and placed sand bags on the <br /> exposed edges. <br /> One(1)sample of granular drainage material was tested for gradation,passed specification and the Sukut <br /> foreman was verbally informed of the test results. Destructive samples of the double textured 60 mil were <br /> also tested and all passed the required. <br /> Adak <br /> repared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br />