Laserfiche WebLink
Y7ECTOR <br /> ENGINEERING INC. <br /> DAILY0 <br /> CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 70 <br /> Location of Work: Client Or Manager hate: Day of The Week: <br /> Manteca,Ca Butch Stefani (Forward,Inc.) November 25, Tuesday <br /> 2003 <br /> General Contractor: Liner Contractor: project Engineer <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Ayre Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-16G blade 1-backhoe 1-smoothdrum roller <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss the deployment schedule for today. They began <br /> to deploy GCL on the south slope of the cell beginning in the southwest comer working west to east. <br /> Twenty-six(26)panels of GCL were deployed until the south slope was complete. 60mil single textured <br /> HDPE was deployed over the GCL for the remainder of the day.Nineteen(14)panels were deployed, <br /> seamed and air tested on the south slope.Destructive sample locations were marked for tomorrow's cutting.10 <br /> One(1)roll of 60 mil single side textured HDPE approved for placement during last year's installation will <br /> be used if a shortage of material arises. The manufactures certification for this roll has been obtained, <br /> reviewed and verified on site. <br /> Sukut continued work in the FU-03 cell sump grading, smooth drum rolling and constructing and testing <br /> the lysimeters while waiting for the testing firm to arrive. By late afternoon,the testing firm did not arrive. <br /> The blade and laborers worked on the access road into the cell during road base placement. <br /> Testing of the lysimeters is scheduled for tomorrow morning and will be performed by others. <br /> The weekly meeting was held in the late afternoon to discuss project concerns,progress and scheduling. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-7 <br />