17E "TOR <br /> ENGINEERING INC. <br /> 0 DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 71 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefani(Forward,Inc.) November 26, Wednesday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-backhoe 1-smoothdrum roller <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss the deployment schedule for today. They began <br /> to deploy 60 mil HDPE on the south floor of the cell beginning in the southwest comer working west to <br /> east. Twenty-two(22)panels of single and double textured liner were deployed until the southern third of <br /> the floor was complete. 60mil double textured HDPE was deployed until the remainder of the floor was <br /> covered. This completed the double textured portion of the cell deployment. In the afternoon, deployment <br /> of the single textured liner began in the sump until completed. After the panels were deployed, seaming and <br /> air testing was completed.Destructive sample locations continued to be marked for cutting. The GSE <br /> foreman stated that they would be working tomorrow to complete the sump area tie-in to the south slope <br /> and the primary/secondary tie-in around the sump. This was at the single textured/double textured <br /> boundary. <br /> Sukut worked in the FU-03 cell sump installing the lysimeters prior to the arrival of the testing firm. In <br /> the early morning,the testing firm arrived on site,tested the lysimeters and approved them for installation. <br /> The lysimeters were installed into the clay,the tubes placed in PVC casing and were run up the south slope <br /> out of the sump. Sukut performed minor cleanup and the foreman stated that they would return on Monday <br /> after the Thanksgiving holiday. <br /> Ask <br /> epared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />