My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TITCITOR <br /> ENGINEERINCy INC. <br /> DAILY CONSTRUCTION FIELD REPORT* <br /> Project Name: Project No. Deily Field Report Sequence Number: <br /> Forward Landfill 021605.03 72 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefani (Forward, Inc.) November 27, Thursday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer. <br /> Sukut Construction GSE Saneeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cold,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss the work schedule for today. They began to <br /> wedge weld the sump area tie-in to the south slope and the primary/secondary tie-in around the sump. This <br /> was at the single textured/double textured boundary. The eastern half of the south slope tie-in at the toe of <br /> slope was also completed. Patches were lystered, extrusion welded and vacuum box tested in the sump and <br /> surrounding areas in preparation for tomorrow's forecasted rain. Completion of this work secured the cell <br /> floor clay from weather and prepared the floor liner for Tuesday's(12-2-03)scheduled leak testing by <br /> others. <br /> The foreman stated that the twelve-ounce(12oz)geotextile placed over the liner would begin to be <br /> removed Monday(12-1-03). <br /> Sukut Construction was not on site today. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> ra <br />
The URL can be used to link to this page
Your browser does not support the video tag.