Laserfiche WebLink
17ECTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 81 <br /> Location of Work: Client Or Manager Date: r Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. December 10,2003 1 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cool&breezy with scattered Ken Davila <br /> showers <br /> Equipment on site: <br /> 1-backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Sukut foreman to discuss the daily operation schedule. Because of the <br /> weather,no trucks were delivering today. The laborers were on site but performed no work. The foreman <br /> stated that they would return on Monday(12-15-03), if weather permitted. I informed him that I would <br /> await his call on the weekend to return when they do. <br /> One sieve analysis was completed by late morning and the remainder of the shift was spent on <br /> documentation and report preparation. <br /> To date,4,200 tons of granular drainage material has been placed on the FU-03 east cell floor. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-? <br />