Laserfiche WebLink
17ECTOR <br /> EMGMEENNG,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 82 <br /> Location of Work: Client Or Manager late: I Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. December 15,2003 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Are Khounmouang King Baffle Sukut <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stoc iled, light brown silty Clay Cold,clear and breSa Ken Davila <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After receiving yesterday's phone call from the Sukut foreman that they would be working today,I <br /> arrived on site and met with him to discuss today's game plan. At the time of my arrival,he stated that they <br /> would not be spreading the drainage material because of the saturated conditions of the subgrade and <br /> therefore could not get the equipment onto the cell floor.No trucks would be hauling until Wednesday. <br /> The weekly meeting was held in the mid afternoon to discuss project progress and scheduling. The mix <br /> design for the spillway out of the sedimentation pond had been reviewed and approved by Vector. <br /> Field documentation and final report preparation were performed in the mid to late morning. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> t^_,. <br />