My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> EMGMEENNG,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 82 <br /> Location of Work: Client Or Manager late: I Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. December 15,2003 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Are Khounmouang King Baffle Sukut <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stoc iled, light brown silty Clay Cold,clear and breSa Ken Davila <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After receiving yesterday's phone call from the Sukut foreman that they would be working today,I <br /> arrived on site and met with him to discuss today's game plan. At the time of my arrival,he stated that they <br /> would not be spreading the drainage material because of the saturated conditions of the subgrade and <br /> therefore could not get the equipment onto the cell floor.No trucks would be hauling until Wednesday. <br /> The weekly meeting was held in the mid afternoon to discuss project progress and scheduling. The mix <br /> design for the spillway out of the sedimentation pond had been reviewed and approved by Vector. <br /> Field documentation and final report preparation were performed in the mid to late morning. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> t^_,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.