Laserfiche WebLink
17EC"TOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number.- <br /> Forward <br /> umber:Forward Landfill 021605.03 19 <br /> Location of Work:" Client Or Manager Date: Day of The Week: <br /> Manteca,CA Forward,Inc. 24 Sept 2003 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native light brown silty CLAY Hot, clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-watertruc 1-16G blade, 1-D8 dozer, 1-D6 dozer and 1-633 scra er <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for testing and observations at the location listed above. On site testing included one(1) <br /> Atterberg limits test preparation and two(2)sieve analysis preparations. The sieves were prepared from a <br /> sample off the on site stockpile. The Atterberg limits sample was set to soak overnight for tomorrow's <br /> testing. <br /> ukut continued construction of the FU-03 refuse cell cutting the west slope and the south slope comers and <br /> oor with the two dozers and the scraper. Cut material was placed onto the stockpile. The blade finish <br /> graded the east floor with the laser attachment. Dust control was supplied by the water truck throughout the <br /> day. The Sukut foreman stated that another source for the 3/8 inch granular drainage material was being <br /> located. <br /> Admk <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,7 <br />