My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTOR <br /> PV ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 28 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 7,2003 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Hot,clear and Ken Davila <br /> calm to breezy <br /> Equipment on site: <br /> 2-D6 dozers, 1-watertruc 1-D8 dozer, 1-633 sora er, 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for testing and observations at the location listed above. Sukut Construction completed the <br /> fill placement on the access road from the scale house west toward the FU-03 refuse cell. The 16G blade cut <br /> and shaped the north slope of the refuse cell, over the existing refuse from north to south in the early <br /> morning to finish the slope grading. In the mid morning, he moved to finish blade the access road. The D6 <br /> dozers cut the northwest and southeast comers of the FU-03 cell. The D8 dozer cut the inside north slope of <br /> the same cell with the scraper hauling the excess cut material to the stockpile. <br /> Two(2)nuclear moisture density tests were performed at random locations at finished elevation on the <br /> native fill along the access road. The finished elevation was assumed to be thirty-five feet(35')as it <br /> matched the area that could be measured to the west. The plans did not show an elevation in this area but <br /> the contour line matches the road to the west. Both tests passed specification in density and in moisture <br /> content and the on site foreman was verbally informed of the test results. Results of the constant head <br /> permeability test performed on the granular drainage material were verbally received by phone from the <br /> Vector laboratory and were within specification. Jim(Sukut)and Butch(Forward)were verbally informed <br /> of the passing test results. <br /> Another bulk composite bucket sample of the stockpiled material was obtained of the native clay for off site <br /> testing in the Vector laboratory. The sample will be tested for phi angle in the large-scale direct shear <br /> machine. <br /> BLC Surveying was on site to perform the preliminary survey of the north 5:1 slope of the refuse cell and <br /> also the floor of the cell. Jim stated that clay placement on the cell floor could begin as early as Thursday <br /> (10-9-03) if the next survey was accepted. <br /> Drillers were on site throughout the day to abandon the water well on the access road. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.