Laserfiche WebLink
Y 7PC"TOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD R <br /> SPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 35 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 16,_2003 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal Air <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> 1-D6 dozer, 1-water tm 1-D5 dozer 1-633 scra ers 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for testing and observations at the location listed above. Sukut Construction continued the <br /> earthworks operations with the 16G blade cutting the west FU-03 cell floor areas through the day's shift. <br /> The D6 dozer began cutting the slopes of the leachate pond and the D5 dozer cut the west slope and north- <br /> west corner of the FU-03 cell as the one scraper hauled the excess cut material to the stockpile. <br /> In the mid to late morning,two(2)trucks arrived on site with a total of seventeen(17)rolls of 60 mil <br /> HDPE textured liner. After lunch, one more truck showed up with thirty-three(33)roils of Boz. geotextile. <br /> The material was logged in, checked for damage, and unloaded. GSE personnel unloaded the trucks, <br /> covered the stacked GCL with existing liner and filled sand bags for the rest of the day. <br /> Review of the certifications of all delivered products was performed throughout the day. On site lab <br /> testing of the clay material continued with two(2)sieve analysis samples. One was washed and placed into <br /> the oven for tomorrow's testing and the other was completed. The completed sieve was within specification. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />