Laserfiche WebLink
T7E CTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> 0 T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 36 <br /> Location of Work: Client Or Manager Date: 7 Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 17,2003 1 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David Hasal Are Bryan Fritzler <br /> Source and Description of Fill Material: Weather. CQA Technician: <br /> On site native, light brown silty CLAY Warm,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> 1-D6 dozer, 1-water true 1-D5 dozer, 1-633 sera er, 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for testing and observations at the location listed above. Sukut Construction continued the <br /> earthworks operations with the 16G blade cutting the west FU-03 cell floor area with the scraper hauling the <br /> excess cut material to the access road. The D6 dozer continued cutting the slopes of the leachate pond and <br /> the D5 dozer began cutting the east slope and southeast corner of the desilting pond. <br /> GSE personnel was on site in the morning to unload one truck with twelve(12)rolls of 60mil HDPE <br /> single textured liner,to cover the remainder of the GCL with the onsite liner and, according to the on site <br /> foreman,to demob off site until the 27th of this month. <br /> Review of the certifications of all delivered products continued throughout the day. On site lab testing of <br /> the clay material continued with one(1) sieve analysis completed. The completed sieve was within <br /> specification. <br /> Bryan F. (Vector)was on site today for site over view and to deliver computer components. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> r-? <br />