My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> ENGINEERING,INC. <br /> DALY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 46 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 29,2003 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal Ayre Khounmouang Lochlin Caffey <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Warm, clear and Ken Davila <br /> CLAY breezyto wind <br /> Equipment on site: <br /> 1-D6 dozer, 1-water truck, 1-633 scra er, 1-16G blade, 1-backhoe, 1-trencher, 1-14G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with Ayre K. (GSE superintendent)in the early morning to discuss the <br /> geosynthetic clay liner(GCL)deployment schedule. After reviewing the plans, specifications and a site <br /> walk for measurements, we determined that the roll length of the GCL would not reach the length of the <br /> slope and would therefore require a horizontal slope seam on the five to one(5:1) slope. The job <br /> specifications state that there can be no horizontal seams and we would need the ok from the design <br /> engineer to proceed. A call was placed with the acting project engineer for Vector to inform the design <br /> engineer of the dilemma. <br /> Earthworks operations continued with the one(1) scraper hauling minor amounts of excess clay from the <br /> windrows generated by the blade that continued to finish cut the clay on the cell floor. The D6 dozer and <br /> 14G blade graded and widened the access road into the cell that will be used for general truck access. The <br /> backhoe and trencher completed excavating the anchor trench around the lechate pond. Sukut's surveyors <br /> were on site to shoot the lechate pond and north areas of the FU-03 cell. <br /> Review of the roll certifications of the sixteen ounce(16oz),twelve-ounce(12oz.) geotextile,eight-ounce <br /> (8oz) geotextile and the geonet continued when time permitted. <br /> A weekly meeting was held on site to discuss project progress and scheduling. Lochlin C. (Allied) stated <br /> that the GCL situation would be resolved by the project engineer and GSE and that liner deployment could <br /> not proceed until authorization was given by either the engineer or the Water Board. <br /> Ah <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> ra <br />
The URL can be used to link to this page
Your browser does not support the video tag.