Laserfiche WebLink
6.4.6 ALTERNATIVE DAILY COVERS <br /> The following ADCs are currently used at the site: ash and cement kiln dust <br /> treated and processed auto shredder residue (TASK), construction and <br /> demolition wastessynthet+c-fabr-ie-s, shredded tires, compostable materials (off- <br /> spec, delivered by generator), a*d-processed green materials (PGM), <br /> contaminated soils and synthetic fabrics (tarps). A demonstration program was <br /> performed and approved for the synthetic fabrics usage. All other ADCs listed <br /> above are utilized in compliance with 27 CCR, Section 20690. 1-n-a-ddi-tiawr, <br /> FeFwaFd is planning to use Ash and Cement Kiln Dust-, Treated and Preeessed <br /> Anui ;Te��er Residlde,-an,� Fe ed CenStF , <br /> The operations procedures for each of the types of ADC that will be used at <br /> Forward are described later in this section. <br /> Soil generated from the excavation of each phase of the landfill will be utilized <br /> for daily cover or saved for final cover. However, the actual amount of soil used <br /> for daily cover will be variable based on the amount of ADC material that arrives <br /> at the site. Section 5.2.5 discusses fill phasing and Drawing 5 shows the phasing <br /> plan from which any cover soils will be generated. Section 5.3.1 - Soil Balance, <br /> discusses the soil quantity availability by phase for the life of the landfill. Any <br /> deficiency in onsite soil materials will be reconciled through the use of ADC. <br /> Any available ADC materials will be used for daily cover and excavated <br /> stockpiled onsite soils will be used to supplement the ADC materials to ensure <br /> proper daily cover. ADC will be stockpiled near the working face. Stockpiles <br /> will not be maintained for any significant amount of time. Forward manages the <br /> ADC stockpiles in a manner that prevents fires, vectors, or other nuisance factors <br /> and inadvertent composting. <br /> The placement procedures for each type of ADC that is currently utilized or <br /> planned to be used at the site are as follows: <br /> Processed Green Material (PGM): Green materials received at the landfill may <br /> be processed on-site or pre=processed. PGM received at the landfill is used for <br /> moisture erosion control and/or ADC. A s otter laborer diverts customers with <br /> wood or green waste loads from the access road to a designated area where the <br /> PGM is off-loaded by the customer. On-site staff also monitors the off-loading to <br /> Forward landfill JTD 6-8 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\JTD Rev Sec 6 080105.doc:5/22/02 <br /> Rev. 1:7/2002:Rev.2:4/2003;Rev 3:6/2003 <br /> Amendment No.1:8/1/2005 <br />