My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ensure that trash hazardous wastes and other contaminants are not mixed in with <br /> the green waste material. The PGM is stockpiled on the ground for a maximum <br /> of 21 days. On-site staff monitors any PGM stockpiled for excessive heat, <br /> potential combustion, and other nuisances such as vectors, odors, dust, and litter. <br /> The site supervisor is notified if any of these issues need immediate attention or <br /> additional staffing. A mobile grinder is brought to the site to chip and grind the <br /> stockpile within 21 days. The PGM is transported by on-site personnel and <br /> equipment and deposited near the active face. <br /> Four staff are currently required to apply PGM; one for the loader, two for the <br /> haul trucks, and one for the dozer. Spreading and compacting of the day's <br /> wastes prior to application of daily cover will be consistent with the procedures <br /> established in the facility's JTD. The PGM is loaded onto haul trucks, which then <br /> dump the material on or directly adjacent to the working face requiring daily <br /> cover. The green material is placed over the waste and compacted to provide a <br /> cover with a minimum compacted thickness of six inches and an average <br /> compacted thickness no greater than 12 inches. Dozer(s) are used to evenly <br /> spread the PGM. Theoperator will take ade uate steps to ensure that processed <br /> green material cover will not be exposed to the elements for more than 21 days. <br /> Odor and moisture infiltration are also addressed by utilizing 100 percent soil <br /> cover on days proceeding nonoperational days. <br /> te-apply-12GM -en rt k d erre-fer-tie deze <br /> The leader leads the PGM ente the haul trueks, w.'-.;c-h then duFfl,-, on <br /> the ar * . .ng daily cover, and then the dozer is used to evenly spread the <br /> an an aveF aeie�_4 <br /> that is placed-as Bever is net expesed-fer greateF than 21-days. If more material <br /> comes in than is required for the day, the material is stockpiled onsite and <br /> processed and used, as needed. PGM is generally processed within 72 hours. <br /> Geosynthetic Blanket and Panel Products (Tarps):_ During dailylandfill <br /> operations, the size of the working; face will be maintained at a size five (5) to <br /> ten 0 0) feet smaller for each dimension as compared to the size of the ADC <br /> panel total area. When more than one panel is utilized, they will be overlapped <br /> a minimum of three feet and secured. After properly compacting the waste, the <br /> tarp is placed over the exposed refuse. The panel(s) is (are) placed on the <br /> exposed refuse face in the evening. Three staff are required to place the tarp(s). <br /> Forward Landfill JTD 6-9 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\JTD Rev Sec 6 080105.doc:5/22/02 <br /> Rev.1 7/2002:Rev.2:4/2003;Rev 3:6/2003 <br /> Amendment No.1:8/1/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.