Laserfiche WebLink
ensure that trash hazardous wastes and other contaminants are not mixed in with <br /> the green waste material. The PGM is stockpiled on the ground for a maximum <br /> of 21 days. On-site staff monitors any PGM stockpiled for excessive heat, <br /> potential combustion, and other nuisances such as vectors, odors, dust, and litter. <br /> The site supervisor is notified if any of these issues need immediate attention or <br /> additional staffing. A mobile grinder is brought to the site to chip and grind the <br /> stockpile within 21 days. The PGM is transported by on-site personnel and <br /> equipment and deposited near the active face. <br /> Four staff are currently required to apply PGM; one for the loader, two for the <br /> haul trucks, and one for the dozer. Spreading and compacting of the day's <br /> wastes prior to application of daily cover will be consistent with the procedures <br /> established in the facility's JTD. The PGM is loaded onto haul trucks, which then <br /> dump the material on or directly adjacent to the working face requiring daily <br /> cover. The green material is placed over the waste and compacted to provide a <br /> cover with a minimum compacted thickness of six inches and an average <br /> compacted thickness no greater than 12 inches. Dozer(s) are used to evenly <br /> spread the PGM. Theoperator will take ade uate steps to ensure that processed <br /> green material cover will not be exposed to the elements for more than 21 days. <br /> Odor and moisture infiltration are also addressed by utilizing 100 percent soil <br /> cover on days proceeding nonoperational days. <br /> te-apply-12GM -en rt k d erre-fer-tie deze <br /> The leader leads the PGM ente the haul trueks, w.'-.;c-h then duFfl,-, on <br /> the ar * . .ng daily cover, and then the dozer is used to evenly spread the <br /> an an aveF aeie�_4 <br /> that is placed-as Bever is net expesed-fer greateF than 21-days. If more material <br /> comes in than is required for the day, the material is stockpiled onsite and <br /> processed and used, as needed. PGM is generally processed within 72 hours. <br /> Geosynthetic Blanket and Panel Products (Tarps):_ During dailylandfill <br /> operations, the size of the working; face will be maintained at a size five (5) to <br /> ten 0 0) feet smaller for each dimension as compared to the size of the ADC <br /> panel total area. When more than one panel is utilized, they will be overlapped <br /> a minimum of three feet and secured. After properly compacting the waste, the <br /> tarp is placed over the exposed refuse. The panel(s) is (are) placed on the <br /> exposed refuse face in the evening. Three staff are required to place the tarp(s). <br /> Forward Landfill JTD 6-9 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\JTD Rev Sec 6 080105.doc:5/22/02 <br /> Rev.1 7/2002:Rev.2:4/2003;Rev 3:6/2003 <br /> Amendment No.1:8/1/2005 <br />